7909 Brightman Ln
Austin, TX 78733
7909 Brightman Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 7909 Brightman Ln, Austin, TX 78733. The most recent, filed March 19, 2024, covers: “Upgrade electrical service from 200 to 350 amps”.
Compiled from City of Austin records · updated Mar 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2024
- since Mar 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade electrical service from 200 to 350 amps
- AppliedMar 7, 2024
- IssuedMar 19, 2024
- WorkMar '24 – Nov '24
- Final inspectionNov 6, 2024
Passed final inspection Nov 6, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade electrical service from 200 to 350 amps
Upgrade electrical service from 200 to 350 amps
City of Austin permitElectrical PermitFinal- Record
- 2024-029207 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7909 Brightman Ln
What is being built at 7909 Brightman Ln?
The latest filing (City of Austin permit 2024-029207 EP, March 19, 2024) covers upgrade electrical service from 200 to 350 amps.
How many permits and filings does 7909 Brightman Ln have?
1 filing across 1 project, from March 19, 2024 to March 19, 2024.
Is there other construction near 7909 Brightman Ln?
Yes. Nearby filings include 7908 Brightman Ln (request to disconnect. installation of solar modules and equipment on an existing residential home. work will be done on the customer side of the meter, Mar 28, 2024); 604 N Weston Ln (request to disconnect - installation of 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type ii surge protection, Sep 27, 2024); 402 N Weston Ln (installation of a new generator and automatic transfer switch, Mar 7, 2024).
How do I get alerts for new permits at 7909 Brightman Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78733- 7908 Brightman LnMar 28, 2024Request to disconnect. installation of solar modules and equipment on an existing residential home. work will be done on the customer side of the meter · 135 m away
- 604 N Weston LnSep 27, 2024Request to disconnect - installation of 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type ii surge protection · 282 m away
- 402 N Weston LnMar 7, 2024Installation of a new generator and automatic transfer switch · 337 m away
- 201 N Lowell LnSep 5, 2025Install new 22.100 kw rooftop solar system and 27kw energy storage system for existing residential only · 352 m away
- 701 Weston LnMar 2, 2007Rob roy on the lake section one, amended plat of lots 14 and 18 — rob roy on the lake section one, amended plat of lots 14 and 18 · 407 m away
- 8301 Tyndale CvApr 4, 2025Request to disconnect* service upgrade 200a meter base · 462 m away
- 1100 N Weston LnSep 17, 2026Replacement of complete existing central heat and air system with or without duct work · 494 m away
- 901 N Weston LnDec 5, 2023350 amp service upgrade · 534 m away