groundranger
Active · latest filing Oct 2026Residential

305 Brandon Way

Austin, TX 78733

Backup battery system permitted at 305 Brandon Way

An electrical permit filed October 16, 2026, covers installation of a backup battery system and an additional meter socket at 305 Brandon Way in Austin. The City of Austin permit, 2026-128394 EP, is listed as active.

Summarized from City of Austin records · updated Oct 16, 2026

Projects
1
1 filings
Latest filing
Oct 16, 2026
since Oct 16, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 29, 2026
  2. IssuedOct 16, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
19% through of the permit windowOct 16, 2026 → Apr 14, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 305 Brandon Way

What is being installed at 305 Brandon Way?

A City of Austin electrical permit covers a backup battery system and an additional meter socket. The permit does not describe other work.

When was the permit filed for 305 Brandon Way?

The permit was filed on October 16, 2026.

What is the permit number for work at 305 Brandon Way?

The City of Austin permit number is 2026-128394 EP. It is listed as active.

Is new construction planned at 305 Brandon Way?

The available record is for an electrical permit to install a backup battery system and an additional meter socket. It does not indicate new construction.

Is a backup battery system being installed in Austin 78733?

A City of Austin permit for 305 Brandon Way, Austin, TX 78733, covers installation of a backup battery system and an additional meter socket. It was filed October 16, 2026.

Also being built nearby

All of 78733
Email me when it passes final inspection