groundranger
Active · latest filing Oct 2026Residential

1920 Wimberly Ln

Austin, TX 78735

Permit for a 26 kW generator at 1920 Wimberly Ln

An electrical permit indicates a 26 kW generator and 200-amp automatic transfer switch are being installed at 1920 Wimberly Ln. The City of Austin permit was filed on October 20, 2026, and is listed as active.

Summarized from City of Austin records · updated Oct 20, 2026

Projects
1
1 filings
Latest filing
Oct 20, 2026
since Oct 20, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Etj - install 200 amp ats. meter to remain as existing. install 26kw generator

  1. AppliedOct 15, 2026
  2. IssuedOct 20, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
17% through of the permit windowOct 20, 2026 → Apr 18, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Etj - install 200 amp ats. meter to remain as existing. install 26kw generator

    Etj - install 200 amp ats. meter to remain as existing. install 26kw generator

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1920 Wimberly Ln

What is being built at 1920 Wimberly Ln?

A City of Austin electrical permit covers installation of a 26 kW generator and a 200-amp automatic transfer switch. The permit was filed October 20, 2026.

Is a generator being installed at 1920 Wimberly Ln in Austin?

Yes. Permit 2026-136312 EP indicates installation of a 26 kW generator at the address.

What does permit 2026-136312 EP cover?

The active electrical permit covers installing a 200-amp automatic transfer switch and a 26 kW generator. It says the existing meter will remain.

When was the generator permit filed for 1920 Wimberly Ln?

The City of Austin permit was filed on October 20, 2026.

Is the meter being replaced at 1920 Wimberly Ln?

The permit description says the meter is to remain as existing while a 200-amp automatic transfer switch and 26 kW generator are installed.

Also being built nearby

All of 78735
Email me when it passes final inspection