2300 Swirling Wind Cv
Austin, TX 78735
2300 Swirling Wind Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 2300 Swirling Wind Cv, Austin, TX 78735. The most recent, filed March 2, 2007, covers: “Barton creek abc west phase ii”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2300 Swirling Wind Cv
What is being built at 2300 Swirling Wind Cv?
The latest filing (City of Austin case 207009, March 2, 2007) covers barton creek abc west phase ii.
How many permits and filings does 2300 Swirling Wind Cv have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 2300 Swirling Wind Cv?
Yes. Nearby filings include 1925 Wimberly Ln (base: installing a backup battery system and additional meter socket, Oct 28, 2026); 2028 Wimberly Ln (barton creek, abc west, phase 1 — barton creek, abc west, phase 1, Mar 2, 2007); 1920 Wimberly Ln (etj - install 200 amp ats. meter to remain as existing. install 26kw generator, Oct 20, 2026).
How do I get alerts for new permits at 2300 Swirling Wind Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78735- 1925 Wimberly LnOct 28, 2026Base: installing a backup battery system and additional meter socket · 295 m away
- 2028 Wimberly LnMar 2, 2007Barton creek, abc west, phase 1 — barton creek, abc west, phase 1 · 300 m away
- 1920 Wimberly LnOct 20, 2026Etj - install 200 amp ats. meter to remain as existing. install 26kw generator · 338 m away
- 1905 Wimberly LnMar 15, 2024Request to disconnect installing generator and ats · 394 m away
- 1615 Patterson RdNov 5, 2026Etj - disconnect and reconnect only - installation of a 150a and a 200a service-rated automatic transfer switch 28kw whole home generator additional grounding and type 2 surge protection · 422 m away
- 2410-1/2 Wimberly LnJun 17, 2022Saint gabriel catholic school- 2500 wimberley lane · 456 m away
- 2208 Wimberly LnSep 20, 2025Request to disconnect/reconnect replacing 200amp panel with a new 200amp panel keeping existing transfer switch no new meter can required. working on main breaker panel. **serviced by ae · 490 m away
- 8938 Wimberly CvJan 25, 2024Ev install · 502 m away
- 1609 Patterson RdDec 4, 2023200a temporary construction loop meter has already been installed · 528 m away
- 2500 Wimberly LnJan 25, 2024Saint gabriel catholic school · 543 m away