4303 Sendero Dr
Austin, TX 78735
4303 Sendero Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4303 Sendero Dr, Austin, TX 78735. The most recent, filed May 15, 2024, covers: “Express: replace all existing original siding and windows from early 1980s. the home exterior is approximately 50/50 limestone/ plywood siding. the limestone will not be changed existing plywood siding will be replaced with hardyplank. windows will be upgraded from aluminum framed to vinyl and will remain the same size”.
Compiled from City of Austin records · updated May 15, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 15, 2024
- since May 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace all existing original siding and windows from early 1980s. the home exterior is approximately 50/50 limestone/ plywood siding. the limestone will not be changed existing plywood siding will be replaced with hardyplank. windows will be upgraded from aluminum framed to vinyl and will remain the same size
- AppliedMay 13, 2024
- IssuedMay 15, 2024
- WorkMay '24 – Oct '24
- Final inspectionOct 21, 2024
Passed final inspection Oct 21, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: replace all existing original siding and windows from early 1980s. the home exterior is approximately 50/50 limestone/ plywood siding. the limestone will not be changed existing plywood siding will be replaced with hardyplank. windows will be upgraded from aluminum framed to vinyl and will remain the same size
Express: replace all existing original siding and windows from early 1980s. the home exterior is approximately 50/50 limestone/ plywood siding. the limestone will not be changed existing plywood siding will be replaced with hardyplank. windows will be upgraded from aluminum framed to vinyl and will remain the same size
City of Austin permitBuilding PermitFinal- Record
- 2024-059837 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4303 Sendero Dr
What is being built at 4303 Sendero Dr?
The latest filing (City of Austin permit 2024-059837 BP, May 15, 2024) covers express: replace all existing original siding and windows from early 1980s. the home exterior is approximately 50/50 limestone/ plywood siding. the limestone will not be changed existing plywood siding will be replaced with hardyplank. windows will be upgraded from aluminum framed to vinyl and will remain the same size.
How many permits and filings does 4303 Sendero Dr have?
1 filing across 1 project, from May 15, 2024 to May 15, 2024.
Is there other construction near 4303 Sendero Dr?
Yes. Nearby filings include 4305 Sendero Dr (upgrade 100a to 200a main service with a new meter socket rated 200a, Mar 24, 2026); 4307 Sendero Dr (excavate 25 tunnel to repair main drain line under house and excavate 45 trench to repair main drain line in yard, Dec 16, 2025); 4902 Pebblestone Cir (gas line for generator, Jul 7, 2025).
How do I get alerts for new permits at 4303 Sendero Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78735- 4305 Sendero DrMar 24, 2026Upgrade 100a to 200a main service with a new meter socket rated 200a · 23 m away
- 4307 Sendero DrDec 16, 2025Excavate 25 tunnel to repair main drain line under house and excavate 45 trench to repair main drain line in yard · 47 m away
- 4902 Pebblestone CirJul 7, 2025Gas line for generator · 49 m away
- 4207 Sendero DrJul 22, 2026Installation of new generac generator and service rated automatic transfer switch. austin energy disconnect will be needed. (michael rie) · 49 m away
- 4812 Trail Crest CirJul 24, 2024Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 4309 Sendero DrAug 28, 2024Replacement of an existing water heater · 70 m away
- 4804 Trail Crest CirJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 4203 Sendero DrSep 15, 2025Replace main sewer yard line from homeowner clean out to city tap only · 96 m away
- 4903 Pebblestone CirOct 16, 2026Express: replace 7 existing windows - size for size · 96 m away
- 4807 Trail Crest CirApr 2, 2026Express: replace 10 windows (like for like) · 102 m away
- 4905 Pebblestone CirJan 24, 202510 tunnel below the foundation to repair master bathroom branch line. access hole in backyard · 103 m away
- 4809 Trail Crest CirJan 7, 2025Replacement of complete existing central heat and air system with or without duct work · 105 m away