4307 Sendero Dr

Austin, TX 78735

Home solar system gets a 27 kWh energy-storage addition

A 27 kWh energy-storage system was added to the residence’s existing solar PV system under an Austin electrical permit filed September 3, 2025. A separate plumbing permit filed December 16, 2025, described drain-line repairs under the house and in the yard; that permit is marked expired.

Summarized from City of Austin records · updated Dec 16, 2025

Projects
2
2 filings
Latest filing
Dec 16, 2025
since Sep 3, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Excavate 25 tunnel to repair main drain line under house and excavate 45 trench to repair main drain line in yard

  1. AppliedDec 15, 2025
  2. IssuedDec 16, 2025
  3. !WorkDec '25 – Jun '26
  4. Final inspection

Marked expired Jun 22, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Excavate 25 tunnel to repair main drain line under house and excavate 45 trench to repair main drain line in yard

    Excavate 25 tunnel to repair main drain line under house and excavate 45 trench to repair main drain line in yard

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Add 27 kwh energy storage system to existing solar pv system on residence

    Add 27 kwh energy storage system to existing solar pv system on residence

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4307 Sendero Dr

What is being built at 4307 Sendero Dr?

An Austin electrical permit describes adding a 27 kWh energy-storage system to the home’s existing solar PV system. The permit was filed September 3, 2025, and is marked final.

Is a new solar system being installed at 4307 Sendero Dr?

The permit describes adding energy storage to an existing solar PV system, not installing a new solar PV system. The electrical permit is 2025-108665 EP.

What does the 27 kWh permit at 4307 Sendero Dr cover?

Permit 2025-108665 EP covers adding a 27 kWh energy-storage system to the residence’s existing solar PV system. It was filed September 3, 2025, and is marked final.

Is drain-line work planned at 4307 Sendero Dr?

A plumbing permit filed December 16, 2025, describes excavating under the house and in the yard to repair the main drain line. Permit 2025-158762 PP is marked expired.

When were permits filed for work at 4307 Sendero Dr?

The electrical permit for the energy-storage addition was filed September 3, 2025. The plumbing permit for main drain-line repairs was filed December 16, 2025.