5220 W US 290 Hwy Wb
Austin, TX 78735
83.42-kW solar system permitted at 5220 W US 290
City of Austin permits indicate an 83.42-kW photovoltaic system at 5220 W US 290 Hwy Wb. Building and electrical permits were filed March 14–15, 2024, and are listed as final.
Summarized from City of Austin records · updated Mar 15, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Mar 15, 2024
- since Mar 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew photovoltaic (pv) system: 83.42 kw
- AppliedFeb 7, 2024
- IssuedMar 15, 2024
- WorkMar '24 – May '25
- Final inspectionMay 9, 2025
Passed final inspection May 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsNew photovoltaic (pv) system: 83.42 kw
New photovoltaic (pv) system: 83.42 kw
City of Austin permitElectrical PermitFinal- Record
- 2024-027039 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New photovoltaic (pv) system: 83.42 kw
New photovoltaic (pv) system: 83.42 kw
City of Austin permitBuilding PermitFinal- Record
- 2024-027039 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New photovoltaic (pv) system: 83.42 kw
New photovoltaic (pv) system: 83.42 kw
City of Austin permitElectrical PermitFinal- Record
- 2024-027041 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Reface (like for like) new panagraphics panel with applied vinyl
Reface (like for like) new panagraphics panel with applied vinyl
City of Austin permitElectrical PermitExpired- Record
- 2023-097684 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5220 W US 290 Hwy Wb
What is being built at 5220 W US 290 Hwy Wb?
City of Austin permits indicate installation of an 83.42-kW photovoltaic system. The related permits are listed as final.
Is a solar system being installed at 5220 W US 290?
Yes. City of Austin building and electrical permit records describe a new 83.42-kW photovoltaic system.
When were the solar permits filed for 5220 W US 290?
The building permit, 2024-027039 BP, was filed March 14, 2024. Electrical permits 2024-027039 EP and 2024-027041 EP were filed March 15 and March 14, 2024, respectively.
How large is the solar system planned for 5220 W US 290?
The City of Austin permit descriptions list the photovoltaic system at 83.42 kW.
Are the permits for the solar installation at 5220 W US 290 final?
The City of Austin lists building permit 2024-027039 BP and electrical permits 2024-027039 EP and 2024-027041 EP as final.
Also being built nearby
All of 78735- 5410 US 290 Hwy SvrdJun 12, 2020City of austin fire and ems station - travis county · 61 m away
- 5410 W US 290 Hwy Svrd WbMay 1, 2025Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021 · 61 m away
- 5366 US 290 HwyMar 16, 2009Oak hill technology park (withdrawal and resubmittal) — oak hill technology park (withdrawal and resubmittal) · 63 m away
- 5234 W US 290 Hwy WbFeb 25, 2026Frame new facade wall attached to existing over entry area install metal panel siding and eifs cornice · 107 m away
- 5353 US 290 HwyFeb 11, 2013Skateranch fast food · 134 m away
- 5307 US 290 HwyMar 8, 2010Cuchia 290 site plan · 160 m away
- 4912 Monterey Oaks BlvdApr 1, 2020Monterey retail center · 186 m away
- 5318 Industrial Oaks BlvdMar 2, 2007Oak hill industrial park · 197 m away
- 5321 Industrial Oaks BlvdNov 26, 2025Replacement of an existing water heater water heater install · 203 m away
- 5341 Industrial Oaks BlvdNov 25, 2025Fix the main breakers · 226 m away
- 5307 Industrial Oaks BlvdSep 9, 2025Construct new driveway approach of 28 ft. like for like · 253 m away
- 4700 Staggerbrush RdMar 2, 2007Ridgeline apartments · 285 m away