5410 W US 290 Hwy Svrd Wb

Austin, TX 78735

Generator transfer switch replacement at 5410 W US 290

Permits indicate a replacement of the automatic transfer switch for an existing optional standby generator at 5410 W US 290 Hwy Svrd Wb. The building permit was filed December 4, 2024, followed by an electrical permit on January 31, 2025, and a plumbing permit on May 1, 2025; all three are marked final.

Summarized from City of Austin records · updated May 1, 2025

Projects
3
3 filings
Latest filing
May 1, 2025
since Dec 4, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

  1. AppliedOct 15, 2024
  2. IssuedMay 1, 2025
  3. WorkMay '25 – Jun '25
  4. Final inspectionJun 2, 2025

Passed final inspection Jun 2, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

    Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

    Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

    Replace an existing optional standby generator automatic transfer switch on a docking station existing. on existing equipment pad no extension needed. built in 2021

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5410 W US 290 Hwy Svrd Wb

What is happening at 5410 W US 290 Hwy Svrd Wb?

Permits indicate work to replace the automatic transfer switch for an existing optional standby generator. The work uses the existing docking station and equipment pad.

Is a new building being constructed at 5410 W US 290?

The permits describe replacement work on existing generator equipment, not construction of a new building.

What are the permits for at 5410 W US 290?

The records cover a building permit, an electrical permit, and a plumbing permit for replacing the generator’s automatic transfer switch. All three permits are marked final.

When were permits filed for the work at 5410 W US 290?

The building permit, 2024-158528 BP, was filed December 4, 2024. The electrical permit, 2024-158528 EP, followed on January 31, 2025, and the plumbing permit, 2024-158528 PP, was filed May 1, 2025.

Does the generator work at 5410 W US 290 require a new equipment pad?

No. The permit descriptions say the switch replacement will use the existing equipment pad, with no extension needed.