8400 Burkwood Cv
Austin, TX 78735
Backup battery system permitted at 8400 Burkwood Cv
An electrical permit covers installing a backup battery system and an additional meter socket at 8400 Burkwood Cv. The City of Austin issued the active permit on August 13, 2026; the record does not list a project cost or construction area.
Summarized from City of Austin records · updated Aug 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 13, 2026
- since Aug 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayBase: installing a backup battery system and additional meter socket. etj
- AppliedAug 5, 2026
- IssuedAug 13, 2026
- WorkAug '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket. etj
Base: installing a backup battery system and additional meter socket. etj
City of Austin permitElectrical PermitActive- Record
- 2026-101881 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8400 Burkwood Cv
What is being built at 8400 Burkwood Cv?
A City of Austin electrical permit covers a backup battery system and an additional meter socket at the residential address.
When was the permit for 8400 Burkwood Cv issued?
The permit was filed on August 13, 2026, and is listed as active.
What is the permit number for 8400 Burkwood Cv?
The City of Austin permit number is 2026-101881 EP. It covers installation of a backup battery system and an additional meter socket.
Is a backup battery system being installed at 8400 Burkwood Cv?
The active electrical permit indicates installation of a backup battery system and an additional meter socket.
How much will the project at 8400 Burkwood Cv cost?
The permit record does not report a project valuation or estimated cost.
Also being built nearby
All of 78735- 3712 Lost Creek BlvdJan 16, 2024Replace existing underground service to residence only · 178 m away
- 8500 Boxelder CvMay 2, 2024Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. need to rewire the main circuit breaker as it is backwards. we are not upgrading the size of the service not upgrading the meter size · 193 m away
- 3604 Flamevine CvJan 29, 2026Lower existing meter enclosure. install 200 amp ats and 26 kw generator · 202 m away
- 8300 Calera DrMar 2, 2007Barton creek section h, phase 2 — barton creek section h, phase 2 · 240 m away
- 3701 Winding Creek DrJul 25, 2024Emergency repairs - burnt up neutral in gutter separating two main disconnects on the interior. reusing existing meter can but relocating disconnect on exterior per nec. updating grounding system · 292 m away
- 3670 Lost Creek BlvdFeb 25, 2025200-amp underground service rebuild · 404 m away
- 3203 Sweet Autumn CvMar 24, 2025Upgrade an existing 200 amp underground service to a 400 amp service. see attached espa and ae design wr#584000 · 418 m away
- 3200 Clumpgrass CvAug 5, 2025Repairing the underground conduit that enters the meter base. the pvc conduit has dropped out of the meter base exposing the utility wires. we will ultimately need to add a 6 piece of pvc to extend to pvc back into the meter base · 441 m away
- 3664 Lost Creek BlvdSep 9, 2024Home builder loop · 469 m away
- 8409 Calera DrSep 24, 2024Request to disconnect install 150 amp and 200 amp automatic transfer switch on existing 150 amp and 200 amp panels. 320 amp existing meter can. no new meter can required. install 48kw generator · 470 m away
- 3101 Sweet Autumn CvOct 30, 2026Base: installing a backup battery system and additional meter socket · 515 m away
- 3104 Sweet Autumn CvMar 2, 2026Upgrade from 200amp to 350amp service · 545 m away