7607 Black Mountain Dr
Austin, TX 78736
7607 Black Mountain Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7607 Black Mountain Dr, Austin, TX 78736. The most recent, filed July 2, 2025, covers: “Replacement of condenser only”.
Compiled from City of Austin records · updated Jul 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of condenser only
- AppliedJun 30, 2025
- IssuedJul 2, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 14, 2025
Passed final inspection Jul 14, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of condenser only
Replacement of condenser only
City of Austin permitMechanical PermitFinal- Record
- 2025-080813 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: bathroom remodel/shower replacement
Express: bathroom remodel/shower replacement
City of Austin permitPlumbing PermitFinal- Record
- 2023-072207 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7607 Black Mountain Dr
What is being built at 7607 Black Mountain Dr?
The latest filing (City of Austin permit 2025-080813 MP, July 2, 2025) covers replacement of condenser only.
How many permits and filings does 7607 Black Mountain Dr have?
2 filings across 2 projects, from July 2, 2025 to July 2, 2025.
Is there other construction near 7607 Black Mountain Dr?
Yes. Nearby filings include 8560 Red Willow Dr (replacement of complete existing central heat and air system with or without duct work, Jul 7, 2025); 8558 Red Willow Dr (express- remove and replace 11 windows: like for like no structural changes, Feb 26, 2026); 7600 Black Mountain Dr (replacement of an existing water heater replacing 2 current gas water heater with a 2 40 gal gas water heater, Nov 21, 2025).
How do I get alerts for new permits at 7607 Black Mountain Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78736- 8560 Red Willow DrJul 7, 2025Replacement of complete existing central heat and air system with or without duct work · 44 m away
- 8558 Red Willow DrFeb 26, 2026Express- remove and replace 11 windows: like for like no structural changes · 53 m away
- 7600 Black Mountain DrNov 21, 2025Replacement of an existing water heater replacing 2 current gas water heater with a 2 40 gal gas water heater · 57 m away
- 7616 Black Mountain DrMay 19, 2025Replacement of complete existing central heat and air system with or without duct work upstairs only · 70 m away
- 7516 Black Mountain DrAug 25, 2025Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 7705 Black Mountain DrDec 19, 2025Express: replacing 12 windows and 1 door like for like · 82 m away
- 7512 Black Mountain DrJan 6, 2026Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 7517 Covered Bridge DrJan 14, 2025Install evse · 112 m away
- 7501 Black Mountain DrNov 3, 2025Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 8574 Red Willow DrFeb 12, 2025Emergency* we replaced a leaking gas valve behind the gas range and ran the gas line inside the right counter top to make a loop with the new gas valve. we pressurized the gas system to 8 psi and it is still under pressure · 126 m away
- 7606 Chelmsford DrOct 28, 2026Base: installing a backup battery system and additional meter socket · 129 m away
- 7600 Chelmsford DrMar 2, 2026Replacement of an existing water heater 40gal gas tank located in a closet · 135 m away