7616 Black Mountain Dr
Austin, TX 78736
7616 Black Mountain Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7616 Black Mountain Dr, Austin, TX 78736. The most recent, filed May 19, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work upstairs only”.
Compiled from City of Austin records · updated May 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2025
- since May 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work upstairs only
- AppliedMay 14, 2025
- IssuedMay 19, 2025
- WorkMay '25 – May '25
- Final inspectionMay 21, 2025
Passed final inspection May 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work upstairs only
Replacement of complete existing central heat and air system with or without duct work upstairs only
City of Austin permitMechanical PermitFinal- Record
- 2025-059887 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7616 Black Mountain Dr
What is being built at 7616 Black Mountain Dr?
The latest filing (City of Austin permit 2025-059887 MP, May 19, 2025) covers replacement of complete existing central heat and air system with or without duct work upstairs only.
How many permits and filings does 7616 Black Mountain Dr have?
1 filing across 1 project, from May 19, 2025 to May 19, 2025.
Is there other construction near 7616 Black Mountain Dr?
Yes. Nearby filings include 7705 Black Mountain Dr (express: replacing 12 windows and 1 door like for like, Dec 19, 2025); 7711 Covered Bridge Dr (replacement of an existing water heater, Feb 1, 2024); 7607 Black Mountain Dr (replacement of condenser only, Jul 2, 2025).
How do I get alerts for new permits at 7616 Black Mountain Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78736- 7705 Black Mountain DrDec 19, 2025Express: replacing 12 windows and 1 door like for like · 63 m away
- 7711 Covered Bridge DrFeb 1, 2024Replacement of an existing water heater · 67 m away
- 7607 Black Mountain DrJul 2, 2025Replacement of condenser only · 70 m away
- 7600 Black Mountain DrNov 21, 2025Replacement of an existing water heater replacing 2 current gas water heater with a 2 40 gal gas water heater · 79 m away
- 7715 Covered Bridge DrMar 14, 2025Replacement of an existing water heater · 84 m away
- 7516 Black Mountain DrAug 25, 2025Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 7700 Covered Bridge DrFeb 14, 2024Express - replace 8 windows - like for like · 99 m away
- 8560 Red Willow DrJul 7, 2025Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 7512 Black Mountain DrJan 6, 2026Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 8574 Red Willow DrFeb 12, 2025Emergency* we replaced a leaking gas valve behind the gas range and ran the gas line inside the right counter top to make a loop with the new gas valve. we pressurized the gas system to 8 psi and it is still under pressure · 118 m away
- 7517 Covered Bridge DrJan 14, 2025Install evse · 122 m away
- 8558 Red Willow DrFeb 26, 2026Express- remove and replace 11 windows: like for like no structural changes · 123 m away