9710 Shallowford Dr
Austin, TX 78736
Cobra Stone site plan approved at 9710 Shallowford Dr
Austin approved and released a site plan case named Cobra Stone at 9710 Shallowford Dr on September 26, 2023. The record does not specify the planned building size or construction details.
Summarized from City of Austin records · updated Sep 26, 2023
- Projects
- 4
- 4 filings
- Latest filing
- Sep 26, 2023
- since Oct 6, 2016
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 9710 Shallowford Dr
What is being built at 9710 Shallowford Dr?
Austin records show an approved and released site plan case named Cobra Stone, filed September 26, 2023. The record does not specify what structures or uses are planned.
Is Cobra Stone opening at 9710 Shallowford Dr?
The Austin record is a site plan case, not an opening announcement. It does not provide an opening date.
What is the status of the 9710 Shallowford Dr project?
The Cobra Stone site plan case, number 12140560, is listed as Approved and Released. It was filed on September 26, 2023.
Were there earlier plans for 9710 Shallowford Dr?
Yes. Earlier site plan cases filed in 2016 and 2018 were withdrawn, and a Cobra Stone 290 Yard case filed in 2018 expired. The later Cobra Stone case was approved and released in 2023.
What's planned near Applied Materials Building 32?
At 9710 Shallowford Dr, about 107 meters from Applied Materials Building 32, Austin records show an approved and released Cobra Stone site plan case dated September 26, 2023. The record does not describe the planned construction.
How large is the Cobra Stone project on Shallowford Drive?
The available Austin site plan record does not list a project square footage or valuation.
Also being built nearby
All of 78736- 9701 Shallowford DrSep 11, 2007Larson estates commercial · 99 m away
- 9710 Shallowford Drive · Fp Hacienda PropertiesMar 3, 2026Cobra stone shallowford — new construction — office in pemb · 102 m away
- 9700 E Hwy 290 · Applied Materials Building 32Dec 26, 2024Amat b32 austin office refresh — renovation/alteration — providing construction documentation and limited construction administration for approximately 34,621 sq ft of renovations to existing office and conference rooms within building 32 · 107 m away
- 9700 E U.s. Hwy. 290 · Applied Materials Building 31Feb 14, 2025Amat b31 level 2 office fit up — renovation/alteration — renovation of existing warehouse area to new office space · 107 m away
- 9700 US 290 · Applied Materials Building 32Mar 18, 2024Amat b32 cafe remodel — renovation/alteration — renovations of the existing cafe area and locker rooms into new conference rooms and expanded cafe area · 107 m away
- 9909 Schmidt Lane · Ray Mart INCJul 10, 2026Tri - supply austin ii — new construction — new tiltwall construction for a warehouse and office spaces · 148 m away
- 9909-1/2 Schmidt LnAug 11, 2026West travis county public utility agency 1240 16" transmission main realignment · 168 m away
- 9919-1/2 US 290 HwyJun 27, 2025West travis county public utility agency 290 30 inch transmission main segment 3 · 305 m away
- 9601 US 290 HwyMay 23, 2024Blue haven pool office complex (resubmittal of sp-06-0025d) · 344 m away
- 10010 US 290 HwyJan 18, 2012Lone oaks motors · 394 m away
- 9600 US 290 HwyDec 19, 2023Thomann project · 433 m away
- 9521 US 290 HwyOct 15, 2025Southwest center · 499 m away