9909 Schmidt Lane
Austin, TX 78736 · Ray Mart INC
Tri-Supply warehouse and offices planned on Schmidt Lane
A 92,234-square-foot tiltwall warehouse with office space is planned at 9909 Schmidt Lane in Austin. The project was registered with the Texas Department of Licensing and Regulation on July 10, 2026, with an applicant-estimated cost of $13.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 10, 2026
- since Jul 10, 2026
- Largest scope
- 92,234 sf
- Estimated cost
- $14M
- state registration
Where this project stands
In state plan reviewTri - Supply Austin II
92,234 sq ft · $14M est.
- RegisteredJul 10, 2026
- Plan reviewnow
- ConstructionSep '26 – Dec '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew tiltwall construction for a warehouse and office spaces — tri - supply
TDLR project registrationNew ConstructionProject Registered92,234 sq ft$14M est.- Project #
- TABS2026025013
- Tenant / owner
- Tri - Supply Austin II
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9909 Schmidt Lane
What is being built at 9909 Schmidt Lane?
A TDLR project registration describes new tiltwall construction for a 92,234-square-foot warehouse and office spaces for Tri - Supply Austin II. The project was registered on July 10, 2026.
Is Tri-Supply building a warehouse in Austin?
A TDLR registration names Tri - Supply Austin II and describes a new warehouse with office spaces at 9909 Schmidt Lane. The registration lists the project as new construction.
How large is the Schmidt Lane warehouse project?
The project registration lists 92,234 square feet for the warehouse and office construction.
How much will the Tri-Supply project cost?
The TDLR registration lists an applicant-estimated project cost of $13.5 million. This is the applicant's estimate, not a reported final cost.
What's being built near Cobra Stone Shallowford?
A 92,234-square-foot warehouse and office project for Tri - Supply Austin II is registered at 9909 Schmidt Lane, about 251 meters from Cobra Stone Shallowford at 9710 Shallowford Drive.
Also being built nearby
All of 78736- 9909-1/2 Schmidt LnAug 11, 2026West travis county public utility agency 1240 16" transmission main realignment · 21 m away
- 9710 Shallowford DrSep 26, 2023Cobra stone · 148 m away
- 9700 E U.s. Hwy. 290 · Applied Materials Building 31Feb 14, 2025Amat b31 level 2 office fit up — renovation/alteration — renovation of existing warehouse area to new office space · 170 m away
- 9700 US 290 · Applied Materials Building 32Mar 18, 2024Amat b32 cafe remodel — renovation/alteration — renovations of the existing cafe area and locker rooms into new conference rooms and expanded cafe area · 170 m away
- 9700 E Hwy 290 · Applied Materials Building 32Dec 26, 2024Amat b32 austin office refresh — renovation/alteration — providing construction documentation and limited construction administration for approximately 34,621 sq ft of renovations to existing office and conference rooms within building 32 · 170 m away
- 9919-1/2 US 290 HwyJun 27, 2025West travis county public utility agency 290 30 inch transmission main segment 3 · 192 m away
- 9701 Shallowford DrSep 11, 2007Larson estates commercial · 246 m away
- 9710 Shallowford Drive · Fp Hacienda PropertiesMar 3, 2026Cobra stone shallowford — new construction — office in pemb · 251 m away
- 10010 US 290 HwyJan 18, 2012Lone oaks motors · 308 m away
- 9907-A US 290 HwyMar 2, 2007Cc carlton equipment yard rehabilitation · 372 m away
- 9601 US 290 HwyMay 23, 2024Blue haven pool office complex (resubmittal of sp-06-0025d) · 405 m away
- 10095 US Hwy 290 E · Lone Oak-Travis LLCJul 31, 2025Capital reyes racking — renovation/alteration — lower 3 beam levels of existing rack and add new beam to existing 3 rows of back-to-back pallet rack · 479 m away