Solar and HVAC work permitted at 10105 Hibiscus Cv
Austin permits indicate a 7 kW rooftop solar PV system and 15 kWh energy storage system at this residence. The solar permit was filed October 31, 2025; a separate permit filed September 25, 2025, covers replacement of the existing central heating and air system with a 4-ton, two-stage gas system.
Summarized from City of Austin records · updated Oct 31, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 31, 2025
- since Sep 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAdd 7 kw solar pv system to roof of residence and 15 kwh energy storage system. utility is pec
- AppliedOct 27, 2025
- IssuedOct 31, 2025
- WorkOct '25 – Nov '25
- Final inspectionNov 3, 2025
Passed final inspection Nov 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsAdd 7 kw solar pv system to roof of residence and 15 kwh energy storage system. utility is pec
Add 7 kw solar pv system to roof of residence and 15 kwh energy storage system. utility is pec
City of Austin permitElectrical PermitFinal- Record
- 2025-138782 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2 stage gas horizontal system
Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2 stage gas horizontal system
City of Austin permitMechanical PermitFinal- Record
- 2025-121847 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10105 Hibiscus Cv
What work is permitted at 10105 Hibiscus Cv?
Austin permits cover a rooftop solar PV system with energy storage and replacement of the home's central heating and air system.
Is solar being installed at 10105 Hibiscus Cv in Austin?
Yes. Permit 2025-138782 EP, filed October 31, 2025, covers a 7 kW rooftop solar PV system and 15 kWh energy storage system. The permit lists PEC as the utility.
How much solar capacity is planned at 10105 Hibiscus Cv?
The October 31, 2025, Austin electrical permit specifies a 7 kW solar PV system and 15 kWh of energy storage.
Is the HVAC system being replaced at 10105 Hibiscus Cv?
Yes. Mechanical permit 2025-121847 MP, filed September 25, 2025, covers replacement of the existing central heat and air system with a 4-ton, two-stage gas horizontal system.
When were the permits filed for 10105 Hibiscus Cv?
Austin records show a mechanical permit filed September 25, 2025, and an electrical permit filed October 31, 2025.
Also being built nearby
All of 78739- 5005 Hibiscus Valley DrApr 12, 2024Installing 26 pv solar panels onto existing asphalt shingle rooftop; 459 total square fee. project also includes installing 2 tesla batteries at exterior wall of residence and will require temporary disconnect and reconnect · 39 m away
- 5004 Tiger Lily WayDec 27, 2023Excavate 28 tunnel to repair drain line · 51 m away
- 5108 Hibiscus Valley DrJul 16, 2026Replacement of an existing water heater 50gal gas tank located in the garage · 83 m away
- 4917 Hibiscus Valley DrJul 9, 2024Installation of a level 2 ev charger. wire run consisting of thhn 6 wire will start from the outside panel go through conduit to an outdoor rated nema plug box where the ev charger will connect to · 96 m away
- 4932 Tiger Lily WayDec 9, 2025New in-ground pool with equipment pad and pool coping · 102 m away
- 5024 Tiger Lily WayMay 27, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system · 104 m away
- 4916 Hibiscus Valley DrFeb 25, 2026Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 5116 Hibiscus Valley DrJun 25, 2024Install evse · 110 m away
- 5121 Scottish Thistle DrOct 9, 2024Pec outage upgrade main breaker box to 200 amps no meter can work install evse · 131 m away
- 5113 Scottish Thistle DrJul 2, 2024Replacement of an existing water heater · 140 m away
- 5125 Scottish Thistle DrJul 3, 2024Install 16 (390w) roof mounted solar panels 6.240 kw solar service system tying into a new 200 amp rated msp · 143 m away
- 5120 Bluestar DrApr 5, 2024Replacement of complete existing central heat and air system with or without duct work · 174 m away