5004 Tiger Lily Way: 1 project on record
City of Austin lists 1 filing across 1 project at 5004 Tiger Lily Way, Austin, TX 78739. The most recent, filed December 27, 2023, covers: “Excavate 28 tunnel to repair drain line”.
Compiled from City of Austin records · updated Dec 27, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 27, 2023
- since Dec 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredExcavate 28 tunnel to repair drain line
- AppliedDec 26, 2023
- IssuedDec 27, 2023
- !WorkDec '23 – Jan '25
- Final inspection
Marked expired Jun 11, 2026.
Permit & project history
1 projectExcavate 28 tunnel to repair drain line
Excavate 28 tunnel to repair drain line
City of Austin permitPlumbing PermitExpired- Record
- 2023-163206 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5004 Tiger Lily Way
What is being built at 5004 Tiger Lily Way?
The latest filing (City of Austin permit 2023-163206 PP, December 27, 2023) covers excavate 28 tunnel to repair drain line.
How many permits and filings does 5004 Tiger Lily Way have?
1 filing across 1 project, from December 27, 2023 to December 27, 2023.
Is there other construction near 5004 Tiger Lily Way?
Yes. Nearby filings include 5005 Hibiscus Valley Dr (installing 26 pv solar panels onto existing asphalt shingle rooftop; 459 total square fee. project also includes installing 2 tesla batteries at exterior wall of residence and will require temporary disconnect and reconnect, Apr 12, 2024); 10105 Hibiscus Cv (add 7 kw solar pv system to roof of residence and 15 kwh energy storage system. utility is pec, Oct 31, 2025); 4932 Tiger Lily Way (new in-ground pool with equipment pad and pool coping, Dec 9, 2025).
How do I get alerts for new permits at 5004 Tiger Lily Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78739- 5005 Hibiscus Valley DrApr 12, 2024Installing 26 pv solar panels onto existing asphalt shingle rooftop; 459 total square fee. project also includes installing 2 tesla batteries at exterior wall of residence and will require temporary disconnect and reconnect · 39 m away
- 10105 Hibiscus CvOct 31, 2025Add 7 kw solar pv system to roof of residence and 15 kwh energy storage system. utility is pec · 51 m away
- 4932 Tiger Lily WayDec 9, 2025New in-ground pool with equipment pad and pool coping · 61 m away
- 4917 Hibiscus Valley DrJul 9, 2024Installation of a level 2 ev charger. wire run consisting of thhn 6 wire will start from the outside panel go through conduit to an outdoor rated nema plug box where the ev charger will connect to · 73 m away
- 5024 Tiger Lily WayMay 27, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system · 85 m away
- 4916 Hibiscus Valley DrFeb 25, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 5108 Hibiscus Valley DrJul 16, 2026Replacement of an existing water heater 50gal gas tank located in the garage · 134 m away
- 5005 Scottish Thistle DrJul 3, 2025Relocate kitchen waste and water · 143 m away
- 5009 Scottish Thistle DrJan 6, 2025Install evse · 144 m away
- 5113 Scottish Thistle DrJul 2, 2024Replacement of an existing water heater · 149 m away
- 4925 Scottish Thistle DrMar 28, 2025Replacement of an existing water heater replaced 40g ng water heater in garage · 149 m away
- 5017 Scottish Thistle DrNov 7, 2024Express: window replacement (15 windows like for like) · 151 m away