10415 Dahlgreen Ave
Austin, TX 78739
Circle C Child Development Center site plan approved in Austin
A site plan for Circle C Child Development Center at 10415 Dahlgreen Ave was approved and released by the City of Austin on August 8, 2025. The case record does not list a project size or construction timeline.
Summarized from City of Austin records · updated Aug 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 8, 2025
- since Oct 5, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 10415 Dahlgreen Ave
What is being built at 10415 Dahlgreen Ave in Austin?
City of Austin records show an approved and released site plan for Circle C Child Development Center, case 11000702, dated August 8, 2025.
Has the Circle C Child Development Center site plan been approved?
Yes. The City of Austin lists case 11000702 as “Approved and Released” on August 8, 2025.
When was the Circle C Child Development Center project filed?
The City of Austin case for Circle C Child Development Center is dated August 8, 2025.
Is construction underway at 10415 Dahlgreen Ave?
The available record is a site plan case approved and released on August 8, 2025; it does not state whether construction has started.
Was a University of St. Augustine expansion planned at this address?
A City of Austin site plan case titled University of St. Augustine Expansion was filed October 5, 2023, and is listed as expired.
What is the status of the University of St. Augustine expansion case?
The case, number 12998663, is listed as expired. A separate Circle C Child Development Center site plan was approved and released on August 8, 2025.
Also being built nearby
All of 78739- 5913 La Crosse Ave · Austin Independent School DistrictJun 11, 2026Like for like* remove existing walk-in box and install new walk-in box and install refrigeration system · 209 m away
- 5519 Ballenton LnFeb 6, 2025Replacement of complete existing central heat and air system with or without duct work · 231 m away
- 5511 Ballenton LnJul 4, 2024Replacement of complete existing central heat and air system with or without duct work · 257 m away
- 10524 Galsworthy LnFeb 11, 2026Main water line replacement starting from the city water meter to the garage. includes adding a main homeowner shut off valve a prv tracing wire and itll be a minimum of 12 deep underground · 267 m away
- 10507 Galsworthy LnFeb 5, 2026Replace water line (approx. 45 ft) in yard from meter to house · 267 m away
- 5507 Ballenton LnJul 21, 2026Express: we are remodeling all bathrooms by replacing showers sinks and bathtubs. additionally we are repairing damaged drywall as well as retexturing and painting existing drywall. lastly we are replacing the current windows with energy-efficient picture-framed windows that are the same size · 270 m away
- 5401 La Crosse AveJan 9, 2024Phase 2 interior remodel 2 classrooms and lab space for the occupational therapy department and upgrading student space · 281 m away
- 10528 Galsworthy LnJan 17, 2025Replacement of an existing water heater · 281 m away
- 5700 Ballenton CtNov 2, 2025Replacement of complete existing central heat and air system with or without duct work · 281 m away
- 5501 Ballenton LnFeb 18, 2025Malobabic - suggested permit language: install new/additional _13.2__kw rooftop solar system to existing residential only using line side tap. utility company - __pec___ · 293 m away
- 5720 Galsworthy CtJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 296 m away
- 5708 Galsworthy CtJun 24, 2024Remove outlet for tub and added gfci outlet in attic for water heater 110 v · 302 m away