groundranger
Recent · latest filing Jun 2026Commercial

5913 La Crosse Ave

Austin, TX 78739 · Austin Independent School District

School upgrades and refrigeration work at 5913 La Crosse Ave

Permits indicate renovation work to create a secured vestibule for students and staff at the school site, with access-control and technology upgrades. A separate mechanical permit finalized June 11, 2026, covers replacing a walk-in box and installing a refrigeration system.

Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jun 11, 2026

Projects
6
6 filings
Latest filing
Jun 11, 2026
since Mar 2, 2007
Largest scope
1,000 sf
Estimated cost
$237K
state registration

Where this project stands

Finaled

Like for like* remove existing walk-in box and install new walk-in box and install refrigeration system

  1. AppliedJun 10, 2026
  2. IssuedJun 11, 2026
  3. WorkJun '26 – Aug '26
  4. Final inspectionAug 11, 2026

Passed final inspection Aug 11, 2026.

1 contact on this project · 1 phone number

Permit & project history

6 projects
  1. Like for like* remove existing walk-in box and install new walk-in box and install refrigeration system

    Like for like* remove existing walk-in box and install new walk-in box and install refrigeration system

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consist of access control and technology upgrades along with minor interior finishes mechanical and electrical scope

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Refit of existing building foyer and administration offices for a secure interior vestibule and associated security hardware — kiker elementary school

    TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$237K est.
    Tenant / owner
    Kiker Elementary School Secure Vestibule
    Design firm
    Pro
    Contact
    Pro
  5. KIKER ELEMENTARY SCHOOL ADDITIONS AND RENOVATIONS

    Kiker elementary school additions and renovations

    City of Austin casesite_planApproved and Released
    Record
    259287
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. SOUTHWEST ELEMENTARY SCHOOL

    Southwest elementary school

    City of Austin casesite_planClosed
    Record
    151674
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin · Texas Department of Licensing and Regulation

Questions about 5913 La Crosse Ave

What is being built at 5913 La Crosse Ave?

Recent permits describe upgrades to a school’s administration and main entry area, including a secured vestibule, and replacement of a walk-in box with a refrigeration system. The records do not describe a new school building.

Is a new school being built at 5913 La Crosse Ave?

The recent filings describe renovation and equipment-replacement work, not construction of a new school. A 2007 site-plan case was titled Kiker Elementary School Additions and Renovations.

What work is planned for the school entrance?

A building permit describes renovating the existing administration and main entry area to create a secured vestibule for students and staff. The scope includes access-control and technology upgrades, plus minor interior, mechanical, and electrical work.

What does permit 2024-075362 BP cover?

The permit covers renovation of the existing administration and main entry area for a secured vestibule. It was finalized on March 14, 2025.

Is the school replacing a walk-in cooler at 5913 La Crosse Ave?

A mechanical permit describes removing an existing walk-in box and installing a new one, along with a refrigeration system. Permit 2026-074124 MP was finalized June 11, 2026.

What is the latest permit for 5913 La Crosse Ave?

The latest filing in the records is mechanical permit 2026-074124 MP, dated June 11, 2026. It covers the walk-in box and refrigeration-system work.

Also being built nearby

All of 78739

More offices in 78739, schools & daycares in 78739.

Email me when a new permit is filed