1416 Montopolis Dr
Austin, TX 78741
Montopolis Center parking expansion and roof replacement
Records show a parking expansion at the Montopolis Neighborhood Center, with site-plan case 11230931 approved and released on July 30, 2015. A City of Austin building permit filed September 11, 2024, covers replacement of the center’s metal roof and has final status.
Summarized from City of Austin records · updated Sep 11, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Sep 11, 2024
- since Oct 6, 2014
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMetal roof replacement at city of austin montopolis neighborhood center
- AppliedNov 30, 2023
- IssuedSep 11, 2024
- WorkSep '24 – Aug '25
- Final inspectionAug 22, 2025
Passed final inspection Aug 22, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsMetal roof replacement at city of austin montopolis neighborhood center
Metal roof replacement at city of austin montopolis neighborhood center
City of Austin permitBuilding PermitFinal- Record
- 2023-153944 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1416 Montopolis Dr
What is being built at 1416 Montopolis Dr?
City records show a parking expansion at the Montopolis Neighborhood Center. Site-plan case 11230931 was approved and released on July 30, 2015.
Is there a parking expansion planned at the Montopolis Neighborhood Center?
A City of Austin site-plan case for a parking expansion was approved and released on July 30, 2015. An earlier parking-expansion case, filed in 2014, expired.
What work was permitted at 1416 Montopolis Dr in 2024?
Permit 2023-153944 BP covers metal roof replacement at the Montopolis Neighborhood Center. It was filed September 11, 2024, and has final status.
Has the Montopolis Center roof replacement permit been finalized?
Yes. City of Austin permit 2023-153944 BP for metal roof replacement has final status; it was filed September 11, 2024.
When was the Montopolis Center parking expansion approved?
Site-plan case 11230931 was approved and released on July 30, 2015. A related case filed October 6, 2014, is listed as expired.
How much will the work at 1416 Montopolis Dr cost?
The records provided do not list a reported valuation or an estimated project cost.
Also being built nearby
All of 78741- 6204-1/2 Fairway StMar 2, 2007Blocker/montopolis · 53 m away
- 1419 Montopolis DrSep 6, 2019San jose subdivision, resub of lot 13 · 74 m away
- 1508 Montopolis DrFeb 22, 2024R&r headwall and sidewall flashing · 74 m away
- 6213 Marigold TerOct 10, 2024Replacement of an existing water heater · 122 m away
- 6205 Marigold TerOct 29, 2026Replacement of complete existing central heat and air system with or without duct work 4-ton condenser with 88k btus furnace changeout · 133 m away
- 1601 Montopolis DrMar 2, 2007Riverside meadows (smart housing) · 161 m away
- 6206 Marigold TerDec 30, 2024Upgrade existing underground fed meter · 167 m away
- 6403 Santos StApr 6, 2026Express: replace walk in shower · 172 m away
- 6202 Marigold TerJun 13, 20255 tunnel on left side to expose broken cast iron to pvc connection · 177 m away
- 6407 Santos StDec 27, 2024Replacement of complete existing central heat and air system with or without duct work · 201 m away
- 6118 Fairway StFeb 12, 2024Unoccupied remodel of fire unit 140 · 206 m away
- 6021 Bluebell CirJul 1, 2024Emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall · 220 m away