1600 Grove Blvd, Austin, TX 78741
Austin, TX 78741 · City Of Austin
Four fleet EV charging stations at 1600 Grove Blvd
Site work for four electric-vehicle charging stations in an existing parking lot for the City of Austin fleet was registered with TDLR on April 15, 2026. The work includes electrical lines, related equipment and restriping for accessible spaces.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 15, 2026
- since Apr 15, 2026
- Largest scope
- 1,565 sf
- Estimated cost
- $194K
- state registration
Where this project stands
Finishing up · inspection nextElectrification Infrastructure Phase 5 - 1600 Grove Blvd
1,565 sq ft · $194K est.
- RegisteredApr 15, 2026
- Plan review
- ConstructionApr '26 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSite work only - four new charging stations in existing parking lot for city of austin fleet, including re-striping for accessible spaces, electrical lines and appurtenances. — ruiz branch, apl
TDLR project registrationRenovation/AlterationReview Complete1,565 sq ft$194K est.- Project #
- TABS2026017722
- Tenant / owner
- Electrification Infrastructure Phase 5 - 1600 Grove Blvd
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1600 Grove Blvd, Austin, TX 78741
What is being built at 1600 Grove Blvd?
The project calls for four EV charging stations in the existing parking lot for the City of Austin fleet. It also includes electrical lines, related equipment and restriping for accessible spaces.
How many EV chargers are planned at 1600 Grove Blvd?
The TDLR project registration describes four new charging stations for the City of Austin fleet.
When was the 1600 Grove Blvd charging project registered?
The TDLR registration, project number TABS2026017722, was filed on April 15, 2026. Its status is listed as Review Complete.
Is a new building being built at 1600 Grove Blvd?
The registration describes site work only in an existing parking lot, including four charging stations and electrical work. It does not describe construction of a new building.
What is the estimated cost of the 1600 Grove Blvd project?
The TDLR registration lists an estimated project cost of $194,000. This is the applicant's estimate, not a confirmed final cost.
Also being built nearby
All of 78741- 1600 Grove BlvdApr 16, 2026Installation of 2 ev chargers city of austin fleet mobility services department · 46 m away
- 1515 Grove BlvdAug 27, 2025Replacement of condenser only safe alliance · 123 m away
- 6003 Bluebell CirAug 19, 2026Express: replace tub to shower 1 piece prefabricated acrylic replace valve with new shower valve no electrical only in wet space · 147 m away
- 1881 Grove BlvdMar 2, 2007Grove place apartments · 165 m away
- 6009 Fairway StOct 2, 20251. installed a new yard water service line using the customer-provided trench. 2. made all necessary connections including: new homeowner shutoff valve and prv. kitech connections at the broken fitting located underneath the walkway. 3. all new pex connections were installed and secured to current standards · 181 m away
- 6005 Marigold TerJul 31, 2025Replacement of an existing water heater · 229 m away
- 6010 Bluebell CirNov 26, 2024Expedited review: new construction of a 2-story secondary apartment [2bed 2.5 bath] with attached carport · 230 m away
- 5704 Penick DrSep 4, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 241 m away
- 5702 Penick DrMay 1, 2025Full lawn irrigation install · 258 m away
- 6011 Marigold TerMay 13, 2024Repairing about 40 feet of sewer yard line pvc piping · 263 m away
- 6104 Fairway StJan 20, 2025Upgrade full service loop including meter riser & panel to 200 amps · 280 m away
- 6021 Bluebell CirJul 1, 2024Emergency permit to reattach main panel & meter enclosure separated from structure. **screws were not properly fastened to the studs causing them to fall · 280 m away