1625 Anise Dr
Austin, TX 78741
1625 Anise Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1625 Anise Dr, Austin, TX 78741. The most recent, filed October 23, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Oct 23, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 23, 2024
- since Oct 23, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedOct 17, 2024
- IssuedOct 23, 2024
- WorkOct '24 – Dec '24
- Final inspectionDec 17, 2024
Passed final inspection Dec 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-140512 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1625 Anise Dr
What is being built at 1625 Anise Dr?
The latest filing (City of Austin permit 2024-140512 PP, October 23, 2024) covers replacement of an existing water heater.
How many permits and filings does 1625 Anise Dr have?
1 filing across 1 project, from October 23, 2024 to October 23, 2024.
Is there other construction near 1625 Anise Dr?
Yes. Nearby filings include 1701 Anise Dr (replacement of complete existing central heat and air system with or without duct work, Nov 10, 2025); 1612 Poppy Seed Ln (replacement of complete existing central heat and air system with or without duct work no duct work, May 26, 2026); 1704 Anise Dr (express: foundation repair, Apr 25, 2025).
How do I get alerts for new permits at 1625 Anise Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 1701 Anise DrNov 10, 2025Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 1612 Poppy Seed LnMay 26, 2026Replacement of complete existing central heat and air system with or without duct work no duct work · 50 m away
- 1704 Anise DrApr 25, 2025Express: foundation repair · 62 m away
- 1708 Poppy Seed LnApr 14, 2026Express: foundation repair - install 15 push piers · 63 m away
- 1605 Anise DrMay 2, 2025Installation of pv solar system · 63 m away
- 1713 Anise DrNov 13, 2026Express: foundation repair - installing 9 steel piers 4 exterior breakouts 1 garage breakout · 64 m away
- 1604 Poppy Seed LnJul 16, 2026Install a new 50a circuit in the 150a main service panel and route wiring directly behind the main panel to the left interior garage wall install the nema 14-50 in an indoor-rated nema receptacle cover and box · 73 m away
- 1717 Anise DrSep 30, 2024Installation of a 17 modules-roof mounted - 6.800 kw dc 5.525 kw ac · 77 m away
- 1701 Poppy Seed LnSep 25, 2025Express- foundation repair · 87 m away
- 1721 Anise DrNov 6, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 1529 Poppy Seed LnFeb 3, 2026Replacement of an existing water heater replace 50-gallon electric water heater located in garage · 125 m away
- 7428 Cayenne LnApr 22, 2025Tunnel under the house at the front left corner of the house and follow the main drain line for 10 feet to make repairs · 131 m away