2102 Hermia St
Austin, TX 78741
2102 Hermia St: 1 project on record
City of Austin lists 1 filing across 1 project at 2102 Hermia St, Austin, TX 78741. The most recent, filed June 11, 2024, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Jun 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2024
- since Jun 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJun 7, 2024
- IssuedJun 11, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 20, 2024
Passed final inspection Jun 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-072147 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2102 Hermia St
What is being built at 2102 Hermia St?
The latest filing (City of Austin permit 2024-072147 EP, June 11, 2024) covers install level 2 ev charger.
How many permits and filings does 2102 Hermia St have?
1 filing across 1 project, from June 11, 2024 to June 11, 2024.
Is there other construction near 2102 Hermia St?
Yes. Nearby filings include 2000 Hermia St (express: foundation repair, Jun 26, 2025); 2109 Hermia St (repair permit to install ev chargepoint charger, Nov 9, 2026); 2203 Theseus Pass (replacement of complete existing central heat and air system with or without duct work install replacement of 3.5 ton ac system and ductwork, Jun 8, 2026).
How do I get alerts for new permits at 2102 Hermia St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78741- 2000 Hermia StJun 26, 2025Express: foundation repair · 54 m away
- 2109 Hermia StNov 9, 2026Repair permit to install ev chargepoint charger · 57 m away
- 2203 Theseus PassJun 8, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3.5 ton ac system and ductwork · 58 m away
- 2201 Hermia StOct 14, 2026Express: foundation repair - installing 19 ext. & 6 int. pilings · 66 m away
- 1901 Hermia StOct 27, 2026Replacement of complete existing central heat and air system with or without duct work like for like 3.5t horizontal gas · 87 m away
- 7312 Oberon StFeb 27, 2024(patelmitesh) - installation of circuit for elec. vehicle charging station-esip · 111 m away
- 7407 Kulmala LnDec 31, 2024Express: foundation repair- installing 21 ext. pilings & 9 int pilings · 114 m away
- 7205 Mowbray StSep 22, 2025Installation of solar panels on existing residential roof. 6.16 kw. addition of 1 0-30a circuits. 14 panels · 118 m away
- 7107 Mowbray StJun 4, 2026Express: foundation repair (install 22 steel piers) · 120 m away
- 7110 E Ben White Blvd Svrd WbMar 14, 2024New irrigation installation · 121 m away
- 7110 Ben White Blvd SvrdJan 19, 2024Ben white self storage · 121 m away
- 2309 Maxwell LnMar 2, 2007Bergara addition — bergara addition · 126 m away