groundranger
Active · latest filing Nov 2026Residential

2109 Hermia St

Austin, TX 78741

Austin home gets EV charger repair and added battery storage

City of Austin permits indicate work at this residence includes an EV charger repair and installation of a new 13.5 kW energy storage system. The active permits were filed November 9, 2026 (2026-144751 EP) and November 5, 2026 (2026-140685 EP); earlier permits filed January 15, 2025, cover rooftop solar and battery storage.

Summarized from City of Austin records · updated Nov 9, 2026

Projects
4
4 filings
Latest filing
Nov 9, 2026
since Jan 15, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Repair permit to install ev chargepoint charger

  1. AppliedNov 3, 2026
  2. IssuedNov 9, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
6% through of the permit windowNov 9, 2026 → May 8, 2027

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Repair permit to install ev chargepoint charger

    Repair permit to install ev chargepoint charger

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Aux power - install new 13.5kw energy storage system. existing pv/ess

    Aux power - install new 13.5kw energy storage system. existing pv/ess

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install new 9.57kw rooftop solar system and 13.5kw battery storage system for existing residential only

    Install new 9.57kw rooftop solar system and 13.5kw battery storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2109 Hermia St

What is being built at 2109 Hermia St?

City of Austin permits indicate an EV charger repair and a new 13.5 kW energy storage system at the residence. The system is described as being added to existing PV and energy storage equipment.

Is an EV charger being installed at 2109 Hermia St?

The November 9, 2026 permit, 2026-144751 EP, is for a repair to install an EV ChargePoint charger. The permit is listed as active.

Is battery storage being added at 2109 Hermia St?

Yes. Active permit 2026-140685 EP, filed November 5, 2026, describes installation of a new 13.5 kW energy storage system.

Does 2109 Hermia St have rooftop solar?

A City of Austin permit filed January 15, 2025, describes installation of a 9.57 kW rooftop solar system and 13.5 kW battery storage system for an existing residence. That permit is listed as final.

When were permits filed for work at 2109 Hermia St?

The latest permits were filed November 5 and November 9, 2026. Earlier electrical permits for solar, battery storage, and related power connections were filed January 15, 2025.

Also being built nearby

All of 78741

More warehouses & industrial in 78741, solar installs in 78741.

Email me when it passes final inspection