Window and drain-system repairs at 2525 Glen Springs Way
Austin permits show work to replace the home's cast-iron drain system and eight windows. The plumbing permit was filed December 5, 2025, and the window permit was filed January 26, 2026; both are marked final.
Summarized from City of Austin records · updated Jan 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 26, 2026
- since Dec 5, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: remove and replace 8 windows (like for like)
- AppliedJan 16, 2026
- IssuedJan 26, 2026
- WorkJan '26 – Apr '26
- Final inspectionApr 9, 2026
Passed final inspection Apr 9, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress: remove and replace 8 windows (like for like)
Express: remove and replace 8 windows (like for like)
City of Austin permitBuilding PermitFinal- Record
- 2026-006302 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
85 tunnel below the foundation to replace entire cast iron drain system. 3 access holes- right left right
85 tunnel below the foundation to replace entire cast iron drain system. 3 access holes- right left right
City of Austin permitPlumbing PermitFinal- Record
- 2025-142169 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2525 Glen Springs Way
What is being built at 2525 Glen Springs Way?
The permits indicate repairs to an existing home, not a new building: replacement of the cast-iron drain system and eight windows.
What work was permitted at 2525 Glen Springs Way in Austin?
A plumbing permit covers replacing the home's cast-iron drain system through an 85-foot tunnel below the foundation. A separate permit covers removing and replacing eight windows like for like.
When were the permits filed for 2525 Glen Springs Way?
The plumbing permit, 2025-142169 PP, was filed December 5, 2025. The window permit, 2026-006302 BP, was filed January 26, 2026.
Is a new home being built at 2525 Glen Springs Way?
The records provided show plumbing and window replacement work at the address, not a permit for new home construction.
What work is happening near Burl North Apartments on Burleson Road?
At 2525 Glen Springs Way, about 203 meters from Burl North Apartments Units 200 and 201, permits indicate replacement of the home's drain system and eight windows.
Also being built nearby
All of 78741- 2517 Glen Springs WaySep 30, 2025Express: foundation repair · 85 m away
- 2500 Biggs DrJul 31, 2025Excavate 22 tunnel to repair main drain line under house serving both bathrooms · 88 m away
- 2606 Metcalfe RdMar 30, 2026Total demolition of sfr 1140 sq ft circa 1950 (tax certificate has 2608 metcalfe but address was recently changed to 2606) · 105 m away
- 2610 Metcalfe RdMar 30, 2026Total demolition of sfr 1248 sq ft circa 1960 · 125 m away
- 2601 Parker LnApr 2, 2026Express- foundation repair on a slab foundation. install 44 total press piling piers including 19 perimeter and 25 interior locations. 25 breakthrough and patched location. we will improve level to the extent · 144 m away
- 2003 Iroquois LnSep 5, 2025Dig two access hole to pipe burst 3/4-1 water line up to 50.includes- trenchless also replace existing water heater with new one · 150 m away
- 2007 Iroquois LnJul 3, 2024Upgrading panel and meter can and riser to code. adding surge protection and grounding · 172 m away
- 2511 Glen Springs WayDec 30, 2024Install level 2 ev charger · 178 m away
- 2500 Parker LnMay 29, 2025Amnesty co for two story single-family residence circa 1966 · 181 m away
- 2009 Iroquois LnJul 12, 2024Construct new driveway approach of 22.33 ft. no sidewalk inspection per plan review · 181 m away
- 2500 Burleson RdApr 17, 2026Replacement of complete existing central heat and air system with or without duct work · 189 m away
- 2509 Glen Springs WayDec 10, 202560 tunnel below the foundation to replace entire drain system. 3 access holes - front back and left · 199 m away