2525 South Lakeshore Blvd
Austin, TX 78741
Permit records show central HVAC system replacement
A City of Austin permit filed May 8, 2024, covers replacement of the existing central heating and air system, with or without ductwork, at 2525 South Lakeshore Blvd. An earlier site plan, approved and released in 2007, identified a new pole barn location for the PARD central maintenance complex.
Summarized from City of Austin records · updated May 8, 2024
- Projects
- 2
- 2 filings
- Latest filing
- May 8, 2024
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work - 1001.356
- AppliedMay 3, 2024
- IssuedMay 8, 2024
- WorkMay '24 – May '24
- Final inspectionMay 14, 2024
Passed final inspection May 14, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work - 1001.356
Replacement of complete existing central heat and air system with or without duct work - 1001.356
City of Austin permitMechanical PermitFinal- Record
- 2024-055644 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2525 South Lakeshore Blvd
What is happening at 2525 South Lakeshore Blvd?
A May 8, 2024, City of Austin mechanical permit covers replacement of the existing central heating and air system, with or without ductwork. The records also show a 2007 site plan for a pole barn location at the PARD central maintenance complex.
Is a new building going up at 2525 South Lakeshore Blvd?
The latest record is for replacing an existing central heating and air system, not a new building. A 2007 site plan for a pole barn location was approved and released.
What does Austin permit 2024-055644 MP cover?
The mechanical permit, filed May 8, 2024, covers replacement of the complete existing central heat and air system, with or without ductwork. Its status is Final.
What's happening near Oracle America on South Lakeshore Blvd?
At 2525 South Lakeshore Blvd, City of Austin records show a May 2024 permit for replacement of an existing central heating and air system. Oracle America is listed nearby at 2300 Oracle Way.
What's happening near the City of Austin on South Lakeshore Blvd?
Records for 2525 South Lakeshore Blvd show a mechanical permit for replacement of the existing central heating and air system, filed May 8, 2024. The City of Austin is listed nearby at 517 South Pleasant Valley Road.
Also being built nearby
All of 78741- 1109 S Pleasant Valley RdAug 26, 2026Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 1109 Pleasant Valley RdFeb 4, 2009Jefferson commons at the ballpark, amended plat of lot 2, block a — jefferson commons at the ballpark, block a; amended plat of lot 2, a resub of lot 1 pleasant valley sportsplex & lot 1 grandslam addition · 177 m away
- 2401 South Lakeshore BlvdJun 17, 2024Replace meter base to existing commerical (unit 5103) only · 209 m away
- 2323 South Lakeshore BlvdOct 29, 2008Kassuba beach phase three demolition site plan · 252 m away
- 2225 South Lakeshore BlvdJan 21, 2022Waterfront phase 1 & 2 · 277 m away
- 1225 Pleasant Valley RdNov 8, 201997 acres east riverside and pleasant valley · 285 m away
- 1300 S Pleasant Valley RdOct 30, 2026Replacement of complete existing central heat and air system with or without duct work · 289 m away
- 1401 Pleasant Valley RdJul 17, 2012Dollar general - pleasant valley road · 314 m away
- 517 S Pleasant Valley RdJun 22, 2026Electrical connection to existing water quality control pond pump at krieg field (city of austin parks and recreation). install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. at the pump controller location install one rack-mounted 7kva 480-120/240-volt transformer with service disconnects for line and load connections. terminate new low-voltage circuit to the pump controller. underground feeder routed in 2 schedule 80 pvc from the 480-volt panel to the transformer with two in-ground quazite boxes with lids. conductor size increased based on limiting voltage drop due to length. pump controller and alarm system provided by others and existing. trenching provided by city of austin parks and recreation · 330 m away
- 517 South Pleasant Valley Road · City Of AustinFeb 17, 2024Afd wellness center parking improvements — renovation/alteration — rehabilitate the existing parking lot and drive isles by replacement of curb and gutter, driveway/drive isles, sidewalk and ramps, geometrical enhancements (tree protection and parking reconfiguration) · 330 m away
- 2300 Oracle Way · Oracle America INCAug 12, 20267 day - interior alteration of approximately 3823 sq ft of existing office space - ova · 332 m away
- 4600 Elmont DrJul 17, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system without duct work for unit telecomm room in leasing building · 348 m away