Electrical work for the existing Krieg Field pond pump

A new electrical connection is being installed for the existing water quality control pond pump at Krieg Field. The City of Austin permit, filed June 22, 2026, covers about 345 feet of conduit and a transformer. A separate mechanical permit filed in 2024 records replacement of the existing heating and air-conditioning system.

Summarized from City of Austin records · updated Jun 22, 2026

Projects
3
3 filings
Latest filing
Jun 22, 2026
since May 24, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Electrical connection to existing water quality control pond pump at krieg field (city of austin parks and recreation). install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. at the pump controller location install one rack-mounted 7kva 480-120/240-volt transformer with service disconnects for line and load connections. terminate new low-voltage circuit to the pump controller. underground feeder routed in 2 schedule 80 pvc from the 480-volt panel to the transformer with two in-ground quazite boxes with lids. conductor size increased based on limiting voltage drop due to length. pump controller and alarm system provided by others and existing. trenching provided by city of austin parks and recreation

  1. AppliedJun 10, 2026
  2. IssuedJun 22, 2026
  3. WorkJun '26 – Oct '26
  4. Final inspectionOct 20, 2026

Passed final inspection Oct 20, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Electrical connection to existing water quality control pond pump at krieg field (city of austin parks and recreation). install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. at the pump controller location install one rack-mounted 7kva 480-120/240-volt transformer with service disconnects for line and load connections. terminate new low-voltage circuit to the pump controller. underground feeder routed in 2 schedule 80 pvc from the 480-volt panel to the transformer with two in-ground quazite boxes with lids. conductor size increased based on limiting voltage drop due to length. pump controller and alarm system provided by others and existing. trenching provided by city of austin parks and recreation

    Electrical connection to existing water quality control pond pump at krieg field (city of austin parks and recreation). install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. at the pump controller location install one rack-mounted 7kva 480-120/240-volt transformer with service disconnects for line and load connections. terminate new low-voltage circuit to the pump controller. underground feeder routed in 2 schedule 80 pvc from the 480-volt panel to the transformer with two in-ground quazite boxes with lids. conductor size increased based on limiting voltage drop due to length. pump controller and alarm system provided by others and existing. trenching provided by city of austin parks and recreation

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of complete existing central heat and air system with or without duct work at austin public safety wellness center

    Replacement of complete existing central heat and air system with or without duct work at austin public safety wellness center

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 517 S Pleasant Valley Rd

What is being built at 517 S Pleasant Valley Rd?

A City of Austin permit covers electrical work for the existing water quality control pond pump at Krieg Field, including conduit, a circuit and a transformer. It does not describe a new building.

What is the electrical work at Krieg Field for?

Permit 2026-074050 EP covers a new electrical connection to the existing pond pump and pump controller. The permit was filed June 22, 2026.

When was the pond pump electrical permit filed?

The City of Austin filed permit 2026-074050 EP on June 22, 2026. Its status is listed as final.

How much conduit is planned at 517 S Pleasant Valley Rd?

The permit describes approximately 345 linear feet of electrical conduit running from an existing panel to the pump connection area.

Was HVAC work permitted at 517 S Pleasant Valley Rd?

Yes. City of Austin mechanical permit 2024-125395 MP, filed September 18, 2024, covers replacement of the existing central heating and air-conditioning system.