517 Pleasant Valley Rd
Austin, TX 78741
Driveway replacements planned at AFD Wellness Center
A City of Austin site-plan case indicates driveway replacements at the AFD Wellness Center at 517 Pleasant Valley Rd. The case was approved and released on July 25, 2024.
Summarized from City of Austin records · updated Jul 25, 2024
- Projects
- 5
- 5 filings
- Latest filing
- Jul 25, 2024
- since Sep 18, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Austin
Questions about 517 Pleasant Valley Rd
What is happening at 517 Pleasant Valley Rd in Austin?
A City of Austin site-plan case describes driveway replacements at the AFD Wellness Center. Case 13203151 was approved and released on July 25, 2024.
What is being built at 517 Pleasant Valley Rd?
The available record is for driveway replacements, not a new building. It does not list a building size or project cost.
When was the driveway project at 517 Pleasant Valley Rd approved?
The site-plan case was approved and released on July 25, 2024. Its case number is 13203151.
Is the AFD Wellness Center driveway project approved?
Yes. City of Austin case 13203151 is listed as Approved and Released, dated July 25, 2024.
Was there an earlier driveway replacement case at this address?
Yes. A related City of Austin case, 12715869, was filed July 23, 2022, and is listed as expired.
What other projects are listed at 517 Pleasant Valley Rd?
Older City of Austin cases from 2007 describe Colorado River Park drainage improvements. They were listed as approved and released.
Also being built nearby
All of 78741- 425 Pleasant Valley RdJul 8, 2026Pard - krieg playing fields - multipurpose field artificial turf conversion · 166 m away
- 517 S Pleasant Valley RdJun 22, 2026Electrical connection to existing water quality control pond pump at krieg field (city of austin parks and recreation). install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. at the pump controller location install one rack-mounted 7kva 480-120/240-volt transformer with service disconnects for line and load connections. terminate new low-voltage circuit to the pump controller. underground feeder routed in 2 schedule 80 pvc from the 480-volt panel to the transformer with two in-ground quazite boxes with lids. conductor size increased based on limiting voltage drop due to length. pump controller and alarm system provided by others and existing. trenching provided by city of austin parks and recreation · 268 m away
- 517 South Pleasant Valley Road · City Of AustinFeb 17, 2024Afd wellness center parking improvements — renovation/alteration — rehabilitate the existing parking lot and drive isles by replacement of curb and gutter, driveway/drive isles, sidewalk and ramps, geometrical enhancements (tree protection and parking reconfiguration) · 268 m away
- 203-1/2 Pleasant Valley RdJan 6, 2026Longhorn dam multimodal improvement · 309 m away
- 1109 S Pleasant Valley RdAug 26, 2026Replacement of complete existing central heat and air system with or without duct work · 474 m away
- 2711 Canterbury StAug 9, 2023Longhorn dam multimodal improvement · 583 m away
- 2525 South Lakeshore BlvdMay 8, 2024Replacement of complete existing central heat and air system with or without duct work - 1001.356 · 598 m away