4141 Governors Row
Austin, TX 78744
4141 Governors Row: 3 projects on record
City of Austin lists 3 filings across 3 projects at 4141 Governors Row, Austin, TX 78744 since March 2, 2007. The most recent, filed May 18, 2009, covers: “Crow industrial park south section nine, lots b-1 and b-2”.
Compiled from City of Austin records · updated May 18, 2009
- Projects
- 3
- 3 filings
- Latest filing
- May 18, 2009
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 4141 Governors Row
What is being built at 4141 Governors Row?
The latest filing (City of Austin case 103870, May 18, 2009) covers crow industrial park south section nine, lots b-1 and b-2.
How many permits and filings does 4141 Governors Row have?
3 filings across 3 projects, from March 2, 2007 to May 18, 2009.
What is being built near American Youthworks, in Austin?
4141 Governors Row is about 103 m from American Youthworks, (1901 E Ben White Blvd). Its latest filing is for crow industrial park south section nine, lots b-1 and b-2.
Is there other construction near 4141 Governors Row?
Yes. Nearby filings include 1901 E Ben White Blvd (american youthworks kitchen remodel — renovation/alteration — replacement of existing kitchen equipment with extension of counters with mep adjustments to accommodate new appliance locations. area of construction is 590 sq ft, Dec 2, 2025); 4150 Freidrich Ln (tumi hospitality south elevation face-lit channel letters, Jan 22, 2026); 4140 Governors Row (non- structural interior renovation-meeting space and fitness center-replacement of soft goods seating and lighting. wall covering and flooring changes, Oct 5, 2026).
How do I get alerts for new permits at 4141 Governors Row?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 1901 E Ben White Blvd · American Youthworks, INCDec 2, 2025American youthworks kitchen remodel — renovation/alteration — replacement of existing kitchen equipment with extension of counters with mep adjustments to accommodate new appliance locations. area of construction is 590 sq ft · 103 m away
- 4150 Freidrich LnJan 22, 2026Tumi hospitality south elevation face-lit channel letters · 137 m away
- 4140 Governors Row · South Austin Lodging Association LLCOct 5, 2026Non- structural interior renovation-meeting space and fitness center-replacement of soft goods seating and lighting. wall covering and flooring changes · 164 m away
- 4143 Governors RowApr 27, 2026New wall sign for homewood suites facing north elevation · 164 m away
- 1901 Ben White Blvd SvrdApr 13, 2009South park site modifications · 226 m away
- 1821 Directors BlvdNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of any self-contained packaged units change out of rtus and split systems. work will take place on the roof and ceiling spaces of levels 1 and 2. new controls wiring will installed and new t-stats · 265 m away
- 4120 Freidrich LnJul 9, 2024Replacement of complete existing central heat and air system with or without duct work · 278 m away
- 1701 Directors BlvdNov 16, 2026Interior non-structural demolition · 316 m away
- 2171 Woodward StMay 29, 2025Concentra woodward - install one (1) set of face lit channel letters on raceway on storefront wall · 329 m away
- 2170 Woodward Street · Agellan Commercial Reit U.s.l.p C/O NewmarkFeb 4, 2025Quest diagnostics austin southpark — renovation/alteration — renovation of existing lab and office space · 371 m away
- 2191 Woodward StApr 10, 2024Replacement of 3 complete existing central heat and air systems with or without duct work · 384 m away
- 2170 Woodward StDec 3, 2025Exterior door access control only · 411 m away