4402 Silverstone Dr
Austin, TX 78744
4402 Silverstone Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4402 Silverstone Dr, Austin, TX 78744. The most recent, filed June 27, 2025, covers: “Express - replace 5 existing windows - size for size”.
Compiled from City of Austin records · updated Jun 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2025
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress - replace 5 existing windows - size for size
Express - replace 5 existing windows - size for size
City of Austin permitBuilding PermitFinal- Record
- 2025-079409 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4402 Silverstone Dr
What is being built at 4402 Silverstone Dr?
The latest filing (City of Austin permit 2025-079409 BP, June 27, 2025) covers express - replace 5 existing windows - size for size.
How many permits and filings does 4402 Silverstone Dr have?
1 filing across 1 project, from June 27, 2025 to June 27, 2025.
Is there other construction near 4402 Silverstone Dr?
Yes. Nearby filings include 4400 Silverstone Dr (express: foundation repair, Mar 25, 2025); 4406 Silverstone Dr (replacement of an existing water heater, Aug 27, 2024); 2507 Patsy Pkwy (water yard line repair roughly 35ft, Aug 8, 2025).
How do I get alerts for new permits at 4402 Silverstone Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 4400 Silverstone DrMar 25, 2025Express: foundation repair · 33 m away
- 4406 Silverstone DrAug 27, 2024Replacement of an existing water heater · 37 m away
- 2507 Patsy PkwyAug 8, 2025Water yard line repair roughly 35ft · 116 m away
- 4406 Ashley WayOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 2504 Jenibeth LnMar 18, 2026Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 2500 Quicksilver BlvdSep 13, 2024Conversion of attached garage into a bedroom bathroom and closet · 123 m away
- 2508 Jenibeth LnOct 17, 2024Express: replace 7 windows like for like · 123 m away
- 4408 Ashley WayFeb 27, 2025Excavate and repair 25 of the 3 inch main line underneath the home. we will replace the broken 3 x 2 wye along with the 4 inch clean out outside · 133 m away
- 4407 Ashley WayMay 30, 2024We will excavate from the exterior perimeter wall. total tunnel length : 60ft plumbing to be replaced: master bath shower drain tub drain toilet drain lavatory drain and kitchen sink drain. we will also replace the main drain and 3x3 wye that ties into hall bath main line · 163 m away
- 2411 Patsy PkwyMar 20, 2024Replacement of complete existing central heat and air system with or without duct work · 165 m away
- 4408 Patsy PkwyApr 4, 20264408 patsy parkway · 204 m away
- 2402 Quicksilver BlvdNov 9, 2026Excavate 7 tunnel to repair main drain line under house · 207 m away