4407 Ashley Way

Austin, TX 78744

4407 Ashley Way: 1 project on record

City of Austin lists 1 filing across 1 project at 4407 Ashley Way, Austin, TX 78744. The most recent, filed May 30, 2024, covers: “We will excavate from the exterior perimeter wall. total tunnel length : 60ft plumbing to be replaced: master bath shower drain tub drain toilet drain lavatory drain and kitchen sink drain. we will also replace the main drain and 3x3 wye that ties into hall bath main line”.

Compiled from City of Austin records · updated May 30, 2024

Projects
1
1 filings
Latest filing
May 30, 2024
since May 30, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will excavate from the exterior perimeter wall. total tunnel length : 60ft plumbing to be replaced: master bath shower drain tub drain toilet drain lavatory drain and kitchen sink drain. we will also replace the main drain and 3x3 wye that ties into hall bath main line

  1. AppliedMay 28, 2024
  2. IssuedMay 30, 2024
  3. WorkMay '24 – Aug '24
  4. Final inspectionAug 16, 2024

Passed final inspection Aug 16, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. We will excavate from the exterior perimeter wall. total tunnel length : 60ft plumbing to be replaced: master bath shower drain tub drain toilet drain lavatory drain and kitchen sink drain. we will also replace the main drain and 3x3 wye that ties into hall bath main line

    We will excavate from the exterior perimeter wall. total tunnel length : 60ft plumbing to be replaced: master bath shower drain tub drain toilet drain lavatory drain and kitchen sink drain. we will also replace the main drain and 3x3 wye that ties into hall bath main line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4407 Ashley Way

What is being built at 4407 Ashley Way?

The latest filing (City of Austin permit 2024-066648 PP, May 30, 2024) covers we will excavate from the exterior perimeter wall. total tunnel length : 60ft plumbing to be replaced: master bath shower drain tub drain toilet drain lavatory drain and kitchen sink drain. we will also replace the main drain and 3x3 wye that ties into hall bath main line.

How many permits and filings does 4407 Ashley Way have?

1 filing across 1 project, from May 30, 2024 to May 30, 2024.

Is there other construction near 4407 Ashley Way?

Yes. Nearby filings include 4408 Ashley Way (excavate and repair 25 of the 3 inch main line underneath the home. we will replace the broken 3 x 2 wye along with the 4 inch clean out outside, Feb 27, 2025); 4406 Ashley Way (replacement of complete existing central heat and air system with or without duct work, Oct 4, 2024); 7410 Poinsetta Ln (replacement of complete existing central heat and air system with or without duct work, Sep 25, 2024).

How do I get alerts for new permits at 4407 Ashley Way?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.