4905 Birch Creek Rd
Austin, TX 78744
4905 Birch Creek Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 4905 Birch Creek Rd, Austin, TX 78744. The most recent, filed August 5, 2024, covers: “Install new 50 gallon gas water heater inside the garage and bring to code”.
Compiled from City of Austin records · updated Aug 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2024
- since Aug 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 50 gallon gas water heater inside the garage and bring to code
- AppliedAug 1, 2024
- IssuedAug 5, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 8, 2024
Passed final inspection Aug 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new 50 gallon gas water heater inside the garage and bring to code
Install new 50 gallon gas water heater inside the garage and bring to code
City of Austin permitPlumbing PermitFinal- Record
- 2024-096771 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4905 Birch Creek Rd
What is being built at 4905 Birch Creek Rd?
The latest filing (City of Austin permit 2024-096771 PP, August 5, 2024) covers install new 50 gallon gas water heater inside the garage and bring to code.
How many permits and filings does 4905 Birch Creek Rd have?
1 filing across 1 project, from August 5, 2024 to August 5, 2024.
Is there other construction near 4905 Birch Creek Rd?
Yes. Nearby filings include 4901 Birch Creek Rd (replacement of complete existing central heat and air system with or without duct work, May 2, 2024); 5000 Birch Creek Rd (installationofapvsolarsystem, Jun 16, 2025); 5700 Teri Rd (excavate 10 tunnel to repair main drain line under house, Oct 20, 2026).
How do I get alerts for new permits at 4905 Birch Creek Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78744- 4901 Birch Creek RdMay 2, 2024Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 5000 Birch Creek RdJun 16, 2025Installationofapvsolarsystem · 60 m away
- 5700 Teri RdOct 20, 2026Excavate 10 tunnel to repair main drain line under house · 77 m away
- 5608 Teri RdJun 2, 2026Dig a 3` x 3` entrance on the right side back corner of home and dig a 6 to 7 foot tunnel and redo all the branch lines in the master bathroom which includes one sink one bathtub and one toilet due to 6 to 7 foot belly · 89 m away
- 5614 Lark Creek DrSep 17, 2024Replacement of an existing water heater · 93 m away
- 5616 Lark Creek DrOct 27, 2025Excavate 17 tunnel to repair main drain line under house · 104 m away
- 5006 Acorn Grove CtOct 29, 2025Replacement of an existing water heater · 116 m away
- 5702 Lark Creek DrMay 8, 2026Replacement of an existing water heater we are swapping out the gas tank watere heater for a similar model · 145 m away
- 5000 Acorn Grove CtJun 4, 2024Express: tub-to-shower conversion siding replacement window replacement (like for like) · 153 m away
- 5005 Acorn Grove CtJun 25, 2025Tunnel to make multiple spot repairs on the sewer line **the tunnel is 65 feet and access is in the front yard left side · 158 m away
- 5608 Meadow CrestApr 18, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 165 m away
- 5508 Lark Creek DrApr 3, 2024Replacement of an existing water heater · 167 m away