2205 Chasewych Dr
Austin, TX 78745
2205 Chasewych Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2205 Chasewych Dr, Austin, TX 78745. The most recent, filed April 3, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Apr 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 3, 2024
- since Apr 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedMar 29, 2024
- IssuedApr 3, 2024
- WorkApr '24 – Apr '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-039572 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2205 Chasewych Dr
What is being built at 2205 Chasewych Dr?
The latest filing (City of Austin permit 2024-039572 PP, April 3, 2024) covers replacement of an existing water heater.
How many permits and filings does 2205 Chasewych Dr have?
1 filing across 1 project, from April 3, 2024 to April 3, 2024.
Is there other construction near 2205 Chasewych Dr?
Yes. Nearby filings include 2203 Chasewych Dr (request to disconnect replace main panel on unit a and unit b due to no main disconnect. new panels to have 100 amp main breaker panel. no work to be done to line side of meter. no espa required, Feb 19, 2026); 2206 W Stassney Ln (replacement of an existing water heater, Aug 27, 2024); 2204 Chasewych Dr (construct new like for like driveway approach of 16 ft, Aug 1, 2024).
How do I get alerts for new permits at 2205 Chasewych Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2203 Chasewych DrFeb 19, 2026Request to disconnect replace main panel on unit a and unit b due to no main disconnect. new panels to have 100 amp main breaker panel. no work to be done to line side of meter. no espa required · 20 m away
- 2206 W Stassney LnAug 27, 2024Replacement of an existing water heater · 29 m away
- 2204 Chasewych DrAug 1, 2024Construct new like for like driveway approach of 16 ft · 49 m away
- 2209 Chasewych DrDec 21, 2023Replacement of an existing water heater · 53 m away
- 2103 Chasewych DrApr 3, 2024Replacement of an existing water heater · 89 m away
- 5429 Fairmont CirJan 8, 202690 tunnel below the foundation to replace entire drain system. 4 access holes- front left back back · 96 m away
- 2108 Lewood CirNov 9, 2026Open living area and kitchen up install structural beam add 2 full bathrooms and 4 additional rooms. no new square footage. two windows being changed to meet egress requirements one being added for the same reason. a civil engineer is working on a tap plan since they are increasing bathrooms to 4 · 98 m away
- 2104 Lewood CirFeb 6, 2026Express: tub to shower conversion · 102 m away
- 2306 W Stassney LnFeb 17, 2026Replacement of an existing water heater · 105 m away
- 5427 Fairmont CirJan 21, 2026Tunnel under foundation from the outside to repipe cast iron drain lines for 2 full bathrooms. three access holes will be made on the left side of the home one in the front left side of the home the second one on the left side of the home where hall bathroom is and the third in the back close to the master bathroom total length of tunnel is 45 feet. kitchen and washer drain line will be rerouted on the right side of the home and ran to the city tap that is located on the front right side of the property. sewer line will be replaced from the home to the city that is about 60 feet long · 106 m away
- 5425 Fairmont CirDec 26, 2025Replace 40 gal ng water heater · 117 m away
- 2305 Chasewych DrJul 7, 2025Replacement of an existing water heater · 121 m away