groundranger
Recent · latest filing Jan 2026Residential

5429 Fairmont Cir

Austin, TX 78745

Drain system replacement permitted at 5429 Fairmont Cir

A City of Austin plumbing permit filed Jan. 8, 2026, covers tunneling beneath the foundation to replace the home's entire drain system. Earlier permits in May and June 2023 covered a rooftop solar system with battery storage, an EV charger, and related electrical work.

Summarized from City of Austin records · updated Jan 8, 2026

Projects
4
4 filings
Latest filing
Jan 8, 2026
since Jan 8, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

90 tunnel below the foundation to replace entire drain system. 4 access holes- front left back back

  1. AppliedDec 22, 2025
  2. IssuedJan 8, 2026
  3. WorkJan '26 – Feb '26
  4. Final inspectionFeb 10, 2026

Passed final inspection Feb 10, 2026.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. 90 tunnel below the foundation to replace entire drain system. 4 access holes- front left back back

    90 tunnel below the foundation to replace entire drain system. 4 access holes- front left back back

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. ***request to disconnect*** shutdown required for installation of 200a automatic transfer switch and battery ess. related to solar auxiliary permit 2023-062230 ep at same address. no meter work will be performed

    ***request to disconnect*** shutdown required for installation of 200a automatic transfer switch and battery ess. related to solar auxiliary permit 2023-062230 ep at same address. no meter work will be performed

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install 7.6kw rooftop mounted solar system and 21 kwh energy storage system

    Install 7.6kw rooftop mounted solar system and 21 kwh energy storage system

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Installation of ev charger

    Installation of ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5429 Fairmont Cir

What work is being done at 5429 Fairmont Cir?

A plumbing permit covers tunneling beneath the foundation to replace the home's entire drain system. The permit, 2025-161179 PP, was filed Jan. 8, 2026.

Is a new home being built at 5429 Fairmont Cir?

The records provided show permits for home improvements, not construction of a new home. The latest permit is for drain system replacement.

When was the drain replacement permitted at 5429 Fairmont Cir?

The City of Austin filed plumbing permit 2025-161179 PP on Jan. 8, 2026. Its status is listed as Final.

Does 5429 Fairmont Cir have a solar permit?

Yes. City of Austin electrical permit 2023-062230 EP, filed May 26, 2023, covers installation of a 7.6 kW rooftop solar system and a 21 kWh energy storage system.

Was an EV charger permitted at 5429 Fairmont Cir?

Yes. City of Austin electrical permit 2023-062154 EP, filed May 24, 2023, covers installation of an EV charger.

What is permit 2023-062454 EP for at 5429 Fairmont Cir?

The electrical permit, filed June 6, 2023, requested a disconnect for installation of a 200-amp automatic transfer switch and battery energy storage system. The record says it is related to solar auxiliary permit 2023-062230 EP.

Also being built nearby

All of 78745
Email me when a new permit is filed