5404 Village Way Ct
Austin, TX 78745
5404 Village Way Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 5404 Village Way Ct, Austin, TX 78745. The most recent, filed November 5, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work without duct work”.
Compiled from City of Austin records · updated Nov 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2024
- since Nov 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work without duct work
- AppliedOct 28, 2024
- IssuedNov 5, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 6, 2024
Passed final inspection Nov 6, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work without duct work
Replacement of complete existing central heat and air system with or without duct work without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-144222 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5404 Village Way Ct
What is being built at 5404 Village Way Ct?
The latest filing (City of Austin permit 2024-144222 MP, November 5, 2024) covers replacement of complete existing central heat and air system with or without duct work without duct work.
How many permits and filings does 5404 Village Way Ct have?
1 filing across 1 project, from November 5, 2024 to November 5, 2024.
Is there other construction near 5404 Village Way Ct?
Yes. Nearby filings include 5403 Village Way Ct (replace approximately 50 of sewer line from house to tap, Sep 10, 2025); 5418 Fairmont Cir (gas test, Jun 2, 2026); 5440 Fairmont Cir (100 tunnel below the foundation to replace entire drain system. trench thru yard to replace yard sewer. 4 access holes. left left back right, Feb 12, 2026).
How do I get alerts for new permits at 5404 Village Way Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5403 Village Way CtSep 10, 2025Replace approximately 50 of sewer line from house to tap · 51 m away
- 5418 Fairmont CirJun 2, 2026Gas test · 65 m away
- 5440 Fairmont CirFeb 12, 2026100 tunnel below the foundation to replace entire drain system. trench thru yard to replace yard sewer. 4 access holes. left left back right · 74 m away
- 5425 Fairmont CirDec 26, 2025Replace 40 gal ng water heater · 84 m away
- 5430 Fairmont CirSep 15, 202665 tunnel below the foundation to replace the drain lines for kitchen and utility. 2 access holes - front right · 85 m away
- 5427 Fairmont CirJan 21, 2026Tunnel under foundation from the outside to repipe cast iron drain lines for 2 full bathrooms. three access holes will be made on the left side of the home one in the front left side of the home the second one on the left side of the home where hall bathroom is and the third in the back close to the master bathroom total length of tunnel is 45 feet. kitchen and washer drain line will be rerouted on the right side of the home and ran to the city tap that is located on the front right side of the property. sewer line will be replaced from the home to the city that is about 60 feet long · 95 m away
- 5402 Fairmont CirDec 8, 2025Remove existing meter can main panel and sub panel replace with approved meter can and new main and sub panel · 95 m away
- 2202 Village Way DrJan 15, 2026Excavate 5 tunnel to repair main drain line under house · 96 m away
- 2204 Village Way DrMar 15, 2024Express - foundation repair · 106 m away
- 5406 Fairmont CirOct 21, 202650 tunnel below the foundation to replace entire drain system. 2 access holes - front right · 109 m away
- 5429 Fairmont CirJan 8, 202690 tunnel below the foundation to replace entire drain system. 4 access holes- front left back back · 110 m away
- 2206 Village Way DrMay 7, 2024Express: foundation repair · 118 m away