5403 Village Way Ct
Austin, TX 78745
5403 Village Way Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 5403 Village Way Ct, Austin, TX 78745. The most recent, filed September 10, 2025, covers: “Replace approximately 50 of sewer line from house to tap”.
Compiled from City of Austin records · updated Sep 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 10, 2025
- since Sep 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace approximately 50 of sewer line from house to tap
- AppliedSep 9, 2025
- IssuedSep 10, 2025
- WorkSep '25 – Sep '25
- Final inspectionSep 22, 2025
Passed final inspection Sep 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace approximately 50 of sewer line from house to tap
Replace approximately 50 of sewer line from house to tap
City of Austin permitPlumbing PermitFinal- Record
- 2025-114492 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5403 Village Way Ct
What is being built at 5403 Village Way Ct?
The latest filing (City of Austin permit 2025-114492 PP, September 10, 2025) covers replace approximately 50 of sewer line from house to tap.
How many permits and filings does 5403 Village Way Ct have?
1 filing across 1 project, from September 10, 2025 to September 10, 2025.
Is there other construction near 5403 Village Way Ct?
Yes. Nearby filings include 5402 Fairmont Cir (remove existing meter can main panel and sub panel replace with approved meter can and new main and sub panel, Dec 8, 2025); 5404 Village Way Ct (replacement of complete existing central heat and air system with or without duct work without duct work, Nov 5, 2024); 5418 Fairmont Cir (gas test, Jun 2, 2026).
How do I get alerts for new permits at 5403 Village Way Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5402 Fairmont CirDec 8, 2025Remove existing meter can main panel and sub panel replace with approved meter can and new main and sub panel · 45 m away
- 5404 Village Way CtNov 5, 2024Replacement of complete existing central heat and air system with or without duct work without duct work · 51 m away
- 5418 Fairmont CirJun 2, 2026Gas test · 56 m away
- 5406 Fairmont CirOct 21, 202650 tunnel below the foundation to replace entire drain system. 2 access holes - front right · 70 m away
- 5403 Fairmont CirMar 30, 2026Excavate roughly 70-80 feet to expose all the underslab sewer lines. cut out all exposed lines and replace using schedule 40 pvc hang all new lines per code using clevis hangers · 92 m away
- 5305 Fairmont CirJun 6, 2026Upgrade main service pigtail remediation and hot tub circuit installation · 98 m away
- 2202 Village Way DrJan 15, 2026Excavate 5 tunnel to repair main drain line under house · 99 m away
- 5405 Fairmont CirDec 11, 2023Upgrade service to 200a including main breaker for generator back up configuration · 109 m away
- 2204 Village Way DrMar 15, 2024Express - foundation repair · 118 m away
- 5440 Fairmont CirFeb 12, 2026100 tunnel below the foundation to replace entire drain system. trench thru yard to replace yard sewer. 4 access holes. left left back right · 121 m away
- 5413 Fairmont CirJan 29, 2024Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa · 126 m away
- 5400 Fairhill DrJan 21, 2024Electrical service entrance replacement including meter enclosure main panel and grounding · 128 m away