Drain system replacement permitted at 5440 Fairmont Cir

A City of Austin plumbing permit filed February 12, 2026, covers replacing the home’s drain system. The work description says crews will tunnel beneath the foundation, trench through the yard to replace the yard sewer, and make four access holes.

Summarized from City of Austin records · updated Feb 12, 2026

Projects
1
1 filings
Latest filing
Feb 12, 2026
since Feb 12, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

100 tunnel below the foundation to replace entire drain system. trench thru yard to replace yard sewer. 4 access holes. left left back right

  1. AppliedJan 6, 2026
  2. IssuedFeb 12, 2026
  3. WorkFeb '26 – Mar '26
  4. Final inspectionMar 4, 2026

Passed final inspection Mar 4, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 100 tunnel below the foundation to replace entire drain system. trench thru yard to replace yard sewer. 4 access holes. left left back right

    100 tunnel below the foundation to replace entire drain system. trench thru yard to replace yard sewer. 4 access holes. left left back right

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5440 Fairmont Cir

What work is permitted at 5440 Fairmont Cir?

The permit covers replacing the entire drain system and the yard sewer. The work description also notes tunneling beneath the foundation and four access holes.

When was the plumbing permit filed for 5440 Fairmont Cir?

The City of Austin permit was filed on February 12, 2026.

What is the permit number for work at 5440 Fairmont Cir?

The permit number is 2026-001440 PP. It is listed as a plumbing permit with final status.

Is a new building being constructed at 5440 Fairmont Cir?

The permit describes plumbing work to replace the existing drain system and yard sewer, not construction of a new building.

Does the work at 5440 Fairmont Cir include tunneling?

Yes. The permit description says a tunnel will be made below the foundation, with four access holes, and a trench will be dug through the yard for the sewer replacement.