5413 Fairmont Cir
Austin, TX 78745
5413 Fairmont Cir: 3 projects on record
City of Austin lists 3 filings across 3 projects at 5413 Fairmont Cir, Austin, TX 78745 since December 5, 2023. The most recent, filed January 29, 2024, covers: “Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa”.
Compiled from City of Austin records · updated Jan 29, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Jan 29, 2024
- since Dec 5, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit withdrawnRequest to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
- AppliedJan 25, 2024
- IssuedJan 29, 2024
- !WorkJan '24 – Jul '24
- Final inspection
Marked withdrawn Feb 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsRequest to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
City of Austin permitElectrical PermitWithdrawn- Record
- 2024-009668 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install energy storage system to existing residence
Install energy storage system to existing residence
City of Austin permitElectrical PermitFinal- Record
- 2023-154427 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa
City of Austin permitElectrical PermitFinal- Record
- 2023-154980 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5413 Fairmont Cir
What is being built at 5413 Fairmont Cir?
The latest filing (City of Austin permit 2024-009668 EP, January 29, 2024) covers request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa.
How many permits and filings does 5413 Fairmont Cir have?
3 filings across 3 projects, from December 5, 2023 to January 29, 2024.
Is there other construction near 5413 Fairmont Cir?
Yes. Nearby filings include 5411 Fairmont Cir (service upgrade 200 amp, Aug 6, 2025); 5406 Fairmont Cir (50 tunnel below the foundation to replace entire drain system. 2 access holes - front right, Oct 21, 2026); 5418 Fairmont Cir (gas test, Jun 2, 2026).
How do I get alerts for new permits at 5413 Fairmont Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5411 Fairmont CirAug 6, 2025Service upgrade 200 amp · 26 m away
- 5406 Fairmont CirOct 21, 202650 tunnel below the foundation to replace entire drain system. 2 access holes - front right · 71 m away
- 5418 Fairmont CirJun 2, 2026Gas test · 80 m away
- 5405 Fairmont CirDec 11, 2023Upgrade service to 200a including main breaker for generator back up configuration · 88 m away
- 5405 Fairhill DrApr 29, 2026Going to do a 200 amp meter and main panel upgrade and are requesting an emergency shutdown due to an old at risk panel · 108 m away
- 5402 Fairmont CirDec 8, 2025Remove existing meter can main panel and sub panel replace with approved meter can and new main and sub panel · 112 m away
- 5403 Village Way CtSep 10, 2025Replace approximately 50 of sewer line from house to tap · 126 m away
- 5403 Fairmont CirMar 30, 2026Excavate roughly 70-80 feet to expose all the underslab sewer lines. cut out all exposed lines and replace using schedule 40 pvc hang all new lines per code using clevis hangers · 127 m away
- 2056 Stassney LnJun 10, 2026West stassney mixed-use · 136 m away
- 5509 Cork PathSep 8, 2025Replacement of an existing water heater · 139 m away
- 2034 W Stassney LnFeb 13, 2024Pylon for dq #13895 (#23-3173) · 140 m away
- 5400 Fairhill DrJan 21, 2024Electrical service entrance replacement including meter enclosure main panel and grounding · 142 m away