2306 Cheyenne Cir
Austin, TX 78745
2306 Cheyenne Cir: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2306 Cheyenne Cir, Austin, TX 78745 since January 9, 2025. The most recent, filed February 14, 2025, covers: “Install new gas line for generator”.
Compiled from City of Austin records · updated Feb 14, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Feb 14, 2025
- since Jan 9, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new gas line for generator
- AppliedFeb 7, 2025
- IssuedFeb 14, 2025
- WorkFeb '25 – Feb '25
- Final inspectionFeb 18, 2025
Passed final inspection Feb 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstall new gas line for generator
Install new gas line for generator
City of Austin permitPlumbing PermitFinal- Record
- 2025-015216 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
22kw whole home generator (natural gas) connected to house meter and main panel. ae disconnect required. (kathy murphy)
22kw whole home generator (natural gas) connected to house meter and main panel. ae disconnect required. (kathy murphy)
City of Austin permitElectrical PermitFinal- Record
- 2025-000760 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express - remove 3 existing windows and two sliding doors and install 3 new double glass low-e argon gas single slider ply-gem simonton pro-contractor windows and 2 sliding glass doors
Express - remove 3 existing windows and two sliding doors and install 3 new double glass low-e argon gas single slider ply-gem simonton pro-contractor windows and 2 sliding glass doors
City of Austin permitBuilding PermitFinal- Record
- 2023-144501 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2306 Cheyenne Cir
What is being built at 2306 Cheyenne Cir?
The latest filing (City of Austin permit 2025-015216 PP, February 14, 2025) covers install new gas line for generator.
How many permits and filings does 2306 Cheyenne Cir have?
3 filings across 3 projects, from January 9, 2025 to February 14, 2025.
Is there other construction near 2306 Cheyenne Cir?
Yes. Nearby filings include 4804 Buckskin Pass (service upgrade to 200 amp. replace federal pacific panel. underground service, Aug 4, 2025); 2305 Cheyenne Cir (request to disconnect -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service and 200 amp ats, Oct 30, 2024); 4801 Broken Bow Pass (install new gfci in attic connecting to existing circuit, Feb 2, 2024).
How do I get alerts for new permits at 2306 Cheyenne Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 4804 Buckskin PassAug 4, 2025Service upgrade to 200 amp. replace federal pacific panel. underground service · 62 m away
- 2305 Cheyenne CirOct 30, 2024Request to disconnect -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service and 200 amp ats · 64 m away
- 4801 Broken Bow PassFeb 2, 2024Install new gfci in attic connecting to existing circuit · 82 m away
- 4900 Broken Bow PassNov 7, 2024Installing a level 2 electric vehicle charger to existing residence · 86 m away
- 4906 Broken Bow PassAug 16, 2024Replace current cast iron drain lines with pvc sch-40 for (3) baths (1) kitchen sink and (1) washer box. replace 40 linear feet of sewer line and reconnect at city tap on property · 105 m away
- 2405 Laramie TrlJan 15, 2026Foundation repair · 107 m away
- 2204 Laramie TrlJun 19, 202440 tunnel below the foundation one access hole on right side of home to repair master bathroom drain line and branch to main · 111 m away
- 4901 Buckskin PassFeb 1, 2024Tunnel below the foundation to repair drain lines and trench thru yard to repair sewer line · 113 m away
- 2305 Laramie TrlAug 6, 2025Express - (retroactive) new electrical panel new hvac unit all new windows with same size windows. replace two tubs with new units. hardibacker and tile replace cabinetry troughout new flooring baseboard paint and finish materials · 119 m away
- 4908 Broken Bow PassJul 9, 2025Express - see attachments · 120 m away
- 4903 Buckskin PassNov 3, 2026Installation of 1 generac 22 kw air-cooled standby generator (model #g007260-0) & ats · 120 m away
- 4801 Buckskin PassMar 8, 2024Replacement of an existing water heater · 128 m away