groundranger
Historic · latest filing Feb 2025Residential

2306 Cheyenne Cir

Austin, TX 78745

2306 Cheyenne Cir: 3 projects on record

City of Austin lists 3 filings across 3 projects at 2306 Cheyenne Cir, Austin, TX 78745 since January 9, 2025. The most recent, filed February 14, 2025, covers: “Install new gas line for generator”.

Compiled from City of Austin records · updated Feb 14, 2025

Projects
3
3 filings
Latest filing
Feb 14, 2025
since Jan 9, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new gas line for generator

  1. AppliedFeb 7, 2025
  2. IssuedFeb 14, 2025
  3. WorkFeb '25 – Feb '25
  4. Final inspectionFeb 18, 2025

Passed final inspection Feb 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Install new gas line for generator

    Install new gas line for generator

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. 22kw whole home generator (natural gas) connected to house meter and main panel. ae disconnect required. (kathy murphy)

    22kw whole home generator (natural gas) connected to house meter and main panel. ae disconnect required. (kathy murphy)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Express - remove 3 existing windows and two sliding doors and install 3 new double glass low-e argon gas single slider ply-gem simonton pro-contractor windows and 2 sliding glass doors

    Express - remove 3 existing windows and two sliding doors and install 3 new double glass low-e argon gas single slider ply-gem simonton pro-contractor windows and 2 sliding glass doors

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2306 Cheyenne Cir

What is being built at 2306 Cheyenne Cir?

The latest filing (City of Austin permit 2025-015216 PP, February 14, 2025) covers install new gas line for generator.

How many permits and filings does 2306 Cheyenne Cir have?

3 filings across 3 projects, from January 9, 2025 to February 14, 2025.

Is there other construction near 2306 Cheyenne Cir?

Yes. Nearby filings include 4804 Buckskin Pass (service upgrade to 200 amp. replace federal pacific panel. underground service, Aug 4, 2025); 2305 Cheyenne Cir (request to disconnect -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service and 200 amp ats, Oct 30, 2024); 4801 Broken Bow Pass (install new gfci in attic connecting to existing circuit, Feb 2, 2024).

How do I get alerts for new permits at 2306 Cheyenne Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Email me when a new permit is filed