4906 Broken Bow Pass
Austin, TX 78745
4906 Broken Bow Pass: 1 project on record
City of Austin lists 1 filing across 1 project at 4906 Broken Bow Pass, Austin, TX 78745. The most recent, filed August 16, 2024, covers: “Replace current cast iron drain lines with pvc sch-40 for (3) baths (1) kitchen sink and (1) washer box. replace 40 linear feet of sewer line and reconnect at city tap on property”.
Compiled from City of Austin records · updated Aug 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 16, 2024
- since Aug 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace current cast iron drain lines with pvc sch-40 for (3) baths (1) kitchen sink and (1) washer box. replace 40 linear feet of sewer line and reconnect at city tap on property
- AppliedAug 14, 2024
- IssuedAug 16, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 6, 2024
Passed final inspection Sep 6, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace current cast iron drain lines with pvc sch-40 for (3) baths (1) kitchen sink and (1) washer box. replace 40 linear feet of sewer line and reconnect at city tap on property
Replace current cast iron drain lines with pvc sch-40 for (3) baths (1) kitchen sink and (1) washer box. replace 40 linear feet of sewer line and reconnect at city tap on property
City of Austin permitPlumbing PermitFinal- Record
- 2024-102771 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4906 Broken Bow Pass
What is being built at 4906 Broken Bow Pass?
The latest filing (City of Austin permit 2024-102771 PP, August 16, 2024) covers replace current cast iron drain lines with pvc sch-40 for (3) baths (1) kitchen sink and (1) washer box. replace 40 linear feet of sewer line and reconnect at city tap on property.
How many permits and filings does 4906 Broken Bow Pass have?
1 filing across 1 project, from August 16, 2024 to August 16, 2024.
Is there other construction near 4906 Broken Bow Pass?
Yes. Nearby filings include 4908 Broken Bow Pass (express - see attachments, Jul 9, 2025); 5000 Broken Bow Pass (12 x 22 swimming pool with 4.5 x 8.5 attached spa and ng heater, Jan 15, 2026); 2405 Laramie Trl (foundation repair, Jan 15, 2026).
How do I get alerts for new permits at 4906 Broken Bow Pass?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 4908 Broken Bow PassJul 9, 2025Express - see attachments · 24 m away
- 5000 Broken Bow PassJan 15, 202612 x 22 swimming pool with 4.5 x 8.5 attached spa and ng heater · 48 m away
- 2405 Laramie TrlJan 15, 2026Foundation repair · 59 m away
- 4900 Broken Bow PassNov 7, 2024Installing a level 2 electric vehicle charger to existing residence · 68 m away
- 2306 Cheyenne CirFeb 14, 2025Install new gas line for generator · 105 m away
- 2402 Remuda TrlJan 10, 2024Irrigation system installation · 119 m away
- 4611 Arapahoe TrlNov 12, 2026Base: installing a backup battery system and additional meter socket · 131 m away
- 4801 Broken Bow PassFeb 2, 2024Install new gfci in attic connecting to existing circuit · 145 m away
- 2305 Laramie TrlAug 6, 2025Express - (retroactive) new electrical panel new hvac unit all new windows with same size windows. replace two tubs with new units. hardibacker and tile replace cabinetry troughout new flooring baseboard paint and finish materials · 144 m away
- 4621 Arapahoe TrlNov 5, 2025Electrical repair on existing service tree fall on overhead wires · 150 m away
- 2305 Cheyenne CirOct 30, 2024Request to disconnect -installation of new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service and 200 amp ats · 156 m away
- 4804 Buckskin PassAug 4, 2025Service upgrade to 200 amp. replace federal pacific panel. underground service · 159 m away
More restaurants in 78745.