2429 Amur Dr
Austin, TX 78745
2429 Amur Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2429 Amur Dr, Austin, TX 78745. The most recent, filed December 13, 2023, covers: “Tunnel below the foundation to spot repair drain line”.
Compiled from City of Austin records · updated Dec 13, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 13, 2023
- since Dec 13, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel below the foundation to spot repair drain line
- AppliedDec 6, 2023
- IssuedDec 13, 2023
- WorkDec '23 – Feb '24
- Final inspectionFeb 15, 2024
Passed final inspection Feb 15, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel below the foundation to spot repair drain line
Tunnel below the foundation to spot repair drain line
City of Austin permitPlumbing PermitFinal- Record
- 2023-156188 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2429 Amur Dr
What is being built at 2429 Amur Dr?
The latest filing (City of Austin permit 2023-156188 PP, December 13, 2023) covers tunnel below the foundation to spot repair drain line.
How many permits and filings does 2429 Amur Dr have?
1 filing across 1 project, from December 13, 2023 to December 13, 2023.
Is there other construction near 2429 Amur Dr?
Yes. Nearby filings include 2417 Amur Dr (replace existing system and install a new hp horizontal, Apr 30, 2024); 2509 Amur Dr (replacement of complete existing central heat and air system with or without duct work, Apr 1, 2024); 2600 Baxter Dr (10 tunnel. major break from sdr going to pvc. technician was able to locate the brake under the master bedroom. install new fitting 10 foot under the home, Mar 19, 2024).
How do I get alerts for new permits at 2429 Amur Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2417 Amur DrApr 30, 2024Replace existing system and install a new hp horizontal · 38 m away
- 2509 Amur DrApr 1, 2024Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 2600 Baxter DrMar 19, 202410 tunnel. major break from sdr going to pvc. technician was able to locate the brake under the master bedroom. install new fitting 10 foot under the home · 58 m away
- 2508 Amur DrApr 1, 2026Replacement of an existing water heater replaced ng water heater · 61 m away
- 2412 Amur DrJun 6, 2025Replacement of an existing water heater replace natural gas water heater · 68 m away
- 2602 Baxter DrMay 22, 2024Express - foundation repair on a slab foundation. install 16 perimeter and 11 interior locations. will tunnel to the interior pier locations. will improve level to the extent · 68 m away
- 2408 Amur DrDec 18, 2025Express: foundation repair · 77 m away
- 2517 Amur DrMar 28, 2024Replacement of an existing water heater · 79 m away
- 2601 Lightfoot TrlSep 17, 2026Express: foundation repair · 79 m away
- 2404 Amur DrFeb 26, 2026Express: removing and replacing 2 windows like for like · 87 m away
- 2513 Lightfoot TrlApr 8, 2025Excavate to expose and repair break by c/o and 10 tunnel below the foundation to repair break on 2 wye servicing master bathroom sink and shower. access hole in back · 89 m away
- 2505 Lightfoot TrlFeb 14, 2025Express: replacing 8 windows (like for like) · 100 m away