2600 Baxter Dr
Austin, TX 78745
2600 Baxter Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2600 Baxter Dr, Austin, TX 78745 since December 4, 2023. The most recent, filed March 19, 2024, covers: “10 tunnel. major break from sdr going to pvc. technician was able to locate the brake under the master bedroom. install new fitting 10 foot under the home”.
Compiled from City of Austin records · updated Mar 19, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Mar 19, 2024
- since Dec 4, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projects10 tunnel. major break from sdr going to pvc. technician was able to locate the brake under the master bedroom. install new fitting 10 foot under the home
10 tunnel. major break from sdr going to pvc. technician was able to locate the brake under the master bedroom. install new fitting 10 foot under the home
City of Austin permitPlumbing PermitFinal- Record
- 2024-033799 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Lehning - install new 5.475kw rooftop solar system to existing residential only using backfed breaker
Lehning - install new 5.475kw rooftop solar system to existing residential only using backfed breaker
City of Austin permitElectrical PermitFinal- Record
- 2023-153309 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Lehning - disconnect/reconnect power to tie in pv component. this permit was pulled in error and we did not upgrade the main service panel on this property
Lehning - disconnect/reconnect power to tie in pv component. this permit was pulled in error and we did not upgrade the main service panel on this property
City of Austin permitElectrical PermitFinal- Record
- 2023-153544 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2600 Baxter Dr
What is being built at 2600 Baxter Dr?
The latest filing (City of Austin permit 2024-033799 PP, March 19, 2024) covers 10 tunnel. major break from sdr going to pvc. technician was able to locate the brake under the master bedroom. install new fitting 10 foot under the home.
How many permits and filings does 2600 Baxter Dr have?
3 filings across 3 projects, from December 4, 2023 to March 19, 2024.
Is there other construction near 2600 Baxter Dr?
Yes. Nearby filings include 2602 Baxter Dr (express - foundation repair on a slab foundation. install 16 perimeter and 11 interior locations. will tunnel to the interior pier locations. will improve level to the extent, May 22, 2024); 2509 Amur Dr (replacement of complete existing central heat and air system with or without duct work, Apr 1, 2024); 2429 Amur Dr (tunnel below the foundation to spot repair drain line, Dec 13, 2023).
How do I get alerts for new permits at 2600 Baxter Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2602 Baxter DrMay 22, 2024Express - foundation repair on a slab foundation. install 16 perimeter and 11 interior locations. will tunnel to the interior pier locations. will improve level to the extent · 19 m away
- 2509 Amur DrApr 1, 2024Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 2429 Amur DrDec 13, 2023Tunnel below the foundation to spot repair drain line · 58 m away
- 2517 Amur DrMar 28, 2024Replacement of an existing water heater · 70 m away
- 2607 Baxter DrNov 10, 2026Addition/ interior remodel to existing 1-story single-family residential to include: *addressing active code violation; retro active permitting of additions of covered front porch and covered rear patio full interior remodel; retro active permit of garage conversion · 71 m away
- 2524 Berkett DrMar 19, 2026Replace 25 feet of sewer line · 79 m away
- 2417 Amur DrApr 30, 2024Replace existing system and install a new hp horizontal · 82 m away
- 2508 Amur DrApr 1, 2026Replacement of an existing water heater replaced ng water heater · 89 m away
- 2611 Baxter DrJul 16, 2026Repair of subfloor sanitary sewer system via tunnel excavation · 107 m away
- 2524 Amur DrNov 10, 2026Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 2529 Baxter DrNov 19, 2025Express- replace walk in shower · 110 m away
- 2601 Amur DrNov 12, 2025Express- foundation repair- installing 14 exterior pilings · 116 m away
More solar installs in 78745.