2615 Baxter Dr
Austin, TX 78745
2615 Baxter Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2615 Baxter Dr, Austin, TX 78745. The most recent, filed July 21, 2025, covers: “Interior remodel to change window header”.
Compiled from City of Austin records · updated Jul 21, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 21, 2025
- since Jul 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInterior remodel to change window header
Interior remodel to change window header
City of Austin permitBuilding PermitFinal- Record
- 2025-085564 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2023-070165 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2615 Baxter Dr
What is being built at 2615 Baxter Dr?
The latest filing (City of Austin permit 2025-085564 BP, July 21, 2025) covers interior remodel to change window header.
How many permits and filings does 2615 Baxter Dr have?
2 filings across 2 projects, from July 21, 2025 to July 21, 2025.
Is there other construction near 2615 Baxter Dr?
Yes. Nearby filings include 2613 Baxter Dr (upgrade 125a meter to 200a (current meter is not in good shape), Nov 11, 2024); 2617 Baxter Dr (replace old federal pacific panel with new main breaker panel, Aug 6, 2024); 2612 Berkett Dr (50 amp nema plug for ev car charger, Jan 17, 2024).
How do I get alerts for new permits at 2615 Baxter Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2613 Baxter DrNov 11, 2024Upgrade 125a meter to 200a (current meter is not in good shape) · 21 m away
- 2617 Baxter DrAug 6, 2024Replace old federal pacific panel with new main breaker panel · 24 m away
- 2612 Berkett DrJan 17, 202450 amp nema plug for ev car charger · 34 m away
- 2610 Berkett DrOct 19, 2026Express - foundation repair · 39 m away
- 2611 Baxter DrJul 16, 2026Repair of subfloor sanitary sewer system via tunnel excavation · 43 m away
- 2612 Baxter DrJul 9, 202560 tunnel below the foundation to replace kitchen/utility drain lines. 2 access holes- front back 20 yard sewer trench to replace yard sewer · 47 m away
- 2620 Berkett DrSep 8, 2025***timed virtual inspection: 12/08/2025 @ 9 am*** replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heatpump system · 84 m away
- 2607 Baxter DrNov 10, 2026Addition/ interior remodel to existing 1-story single-family residential to include: *addressing active code violation; retro active permitting of additions of covered front porch and covered rear patio full interior remodel; retro active permit of garage conversion · 85 m away
- 2627 Baxter DrOct 27, 2025Replacement of an existing water heater · 87 m away
- 2626 Baxter DrMar 19, 2024Tunnel under beam and fix break on main sewer line · 89 m away
- 2609 Berkett DrJul 27, 2026Express: foundation repair create entry tunnel to replumb 2 full bathrooms and reconnect kitchen and laundry sink app 20ft tunnel · 92 m away
- 2601 Amur DrNov 12, 2025Express- foundation repair- installing 14 exterior pilings · 98 m away