2617 Baxter Dr
Austin, TX 78745
2617 Baxter Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2617 Baxter Dr, Austin, TX 78745. The most recent, filed August 6, 2024, covers: “Replace old federal pacific panel with new main breaker panel”.
Compiled from City of Austin records · updated Aug 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 6, 2024
- since Aug 6, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace old federal pacific panel with new main breaker panel
Replace old federal pacific panel with new main breaker panel
City of Austin permitElectrical PermitFinal- Record
- 2024-096645 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2617 Baxter Dr
What is being built at 2617 Baxter Dr?
The latest filing (City of Austin permit 2024-096645 EP, August 6, 2024) covers replace old federal pacific panel with new main breaker panel.
How many permits and filings does 2617 Baxter Dr have?
1 filing across 1 project, from August 6, 2024 to August 6, 2024.
Is there other construction near 2617 Baxter Dr?
Yes. Nearby filings include 2615 Baxter Dr (interior remodel to change window header, Jul 21, 2025); 2612 Berkett Dr (50 amp nema plug for ev car charger, Jan 17, 2024); 2613 Baxter Dr (upgrade 125a meter to 200a (current meter is not in good shape), Nov 11, 2024).
How do I get alerts for new permits at 2617 Baxter Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2615 Baxter DrJul 21, 2025Interior remodel to change window header · 24 m away
- 2612 Berkett DrJan 17, 202450 amp nema plug for ev car charger · 41 m away
- 2613 Baxter DrNov 11, 2024Upgrade 125a meter to 200a (current meter is not in good shape) · 46 m away
- 2610 Berkett DrOct 19, 2026Express - foundation repair · 54 m away
- 2612 Baxter DrJul 9, 202560 tunnel below the foundation to replace kitchen/utility drain lines. 2 access holes- front back 20 yard sewer trench to replace yard sewer · 61 m away
- 2620 Berkett DrSep 8, 2025***timed virtual inspection: 12/08/2025 @ 9 am*** replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical heatpump system · 62 m away
- 2627 Baxter DrOct 27, 2025Replacement of an existing water heater · 63 m away
- 2611 Baxter DrJul 16, 2026Repair of subfloor sanitary sewer system via tunnel excavation · 67 m away
- 2626 Baxter DrMar 19, 2024Tunnel under beam and fix break on main sewer line · 68 m away
- 2609 Amur DrNov 18, 2025Express - foundation repair · 106 m away
- 2609 Berkett DrJul 27, 2026Express: foundation repair create entry tunnel to replumb 2 full bathrooms and reconnect kitchen and laundry sink app 20ft tunnel · 106 m away
- 6204 Blarwood DrJan 5, 2026Replacement of an existing water heater 40gal tank located in the garage · 106 m away