3002 Headly Dr
Austin, TX 78745
3002 Headly Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3002 Headly Dr, Austin, TX 78745. The most recent, filed January 28, 2025, covers: “Replacement of an existing water heater 40-50gl gas wh change out”.
Compiled from City of Austin records · updated Jan 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2025
- since Jan 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater 40-50gl gas wh change out
- AppliedJan 17, 2025
- IssuedJan 28, 2025
- WorkJan '25 – Apr '25
- Final inspectionApr 17, 2025
Passed final inspection Apr 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater 40-50gl gas wh change out
Replacement of an existing water heater 40-50gl gas wh change out
City of Austin permitPlumbing PermitFinal- Record
- 2025-006590 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3002 Headly Dr
What is being built at 3002 Headly Dr?
The latest filing (City of Austin permit 2025-006590 PP, January 28, 2025) covers replacement of an existing water heater 40-50gl gas wh change out.
How many permits and filings does 3002 Headly Dr have?
1 filing across 1 project, from January 28, 2025 to January 28, 2025.
Is there other construction near 3002 Headly Dr?
Yes. Nearby filings include 3004 Headly Dr (water heater, Nov 18, 2024); 3007 Headly Dr (replacement of complete existing central heat and air system with or without duct work, Jun 17, 2024); 3008 Headly Dr (new inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool, Apr 16, 2025).
How do I get alerts for new permits at 3002 Headly Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 3004 Headly DrNov 18, 2024Water heater · 25 m away
- 3007 Headly DrJun 17, 2024Replacement of complete existing central heat and air system with or without duct work · 61 m away
- 3008 Headly DrApr 16, 2025New inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool · 66 m away
- 6306 London DrMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 6513 Lancret Hill DrJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 6304 London DrNov 13, 2025Water heater replacement like for like · 135 m away
- 2904 Bushnell DrOct 13, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out · 156 m away
- 2909 Headly DrJul 14, 2026Replacement of complete existing central heat and air system with or without duct work · 169 m away
- 6512 Lancret Hill DrApr 6, 2026Replacement of complete existing central heat and air system with or without duct work · 180 m away
- 2900 Bushnell DrOct 19, 2026Base: installing a backup battery system and additional meter socket · 189 m away
- 6604 Lancret Hill DrJul 16, 2026Replacement of complete existing central heat and air system with or without duct work rials · 191 m away
- 2903 Bushnell DrOct 2, 2025Express - foundation repair · 203 m away