3008 Headly Dr
Austin, TX 78745
Inground fiberglass pool permitted at 3008 Headly Dr
Austin permits indicate a new inground fiberglass pool with an equipment pad is being installed at 3008 Headly Dr. The building permit was filed March 3, 2025, and an electrical permit for the pool work was filed April 16, 2025. An earlier electrical permit, filed November 4, 2024, covered a service upgrade to accommodate future pool equipment.
Summarized from City of Austin records · updated Apr 16, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Apr 16, 2025
- since Nov 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool
- AppliedNov 6, 2024
- IssuedApr 16, 2025
- WorkApr '25 – May '25
- Final inspectionMay 19, 2025
Passed final inspection May 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsNew inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool
New inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool
City of Austin permitElectrical PermitFinal- Record
- 2025-017093 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool
New inground fiberglass pool with equipment pad some of the existing concrete will be removed to install the pool
City of Austin permitBuilding PermitFinal- Record
- 2025-017093 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade existing electrical service only to 200-amps to accommodate future swimming pool equipment
Upgrade existing electrical service only to 200-amps to accommodate future swimming pool equipment
City of Austin permitElectrical PermitFinal- Record
- 2024-143494 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3008 Headly Dr
What is being built at 3008 Headly Dr?
Austin permits indicate a new inground fiberglass pool with an equipment pad is being installed. The permit description says some existing concrete will be removed for the pool.
When was the pool at 3008 Headly Dr permitted?
The building permit, 2025-017093 BP, was filed March 3, 2025. The related electrical permit, 2025-017093 EP, was filed April 16, 2025.
Is there a permit for pool equipment at 3008 Headly Dr?
Yes. Permit 2025-017093 EP, filed April 16, 2025, covers electrical work for the new pool and equipment pad.
Was electrical service upgraded for the pool at 3008 Headly Dr?
An Austin electrical permit filed November 4, 2024, records an upgrade of the existing electrical service to 200 amps to accommodate future swimming pool equipment.
What does permit 2025-017093 BP cover?
The building permit filed March 3, 2025, describes a new inground fiberglass pool with an equipment pad. It also notes that some existing concrete will be removed.
What does permit 2025-017093 EP cover?
The electrical permit filed April 16, 2025, describes electrical work for the new inground fiberglass pool and equipment pad.
Also being built nearby
All of 78745- 3004 Headly DrNov 18, 2024Water heater · 41 m away
- 3007 Headly DrJun 17, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 3002 Headly DrJan 28, 2025Replacement of an existing water heater 40-50gl gas wh change out · 66 m away
- 6513 Lancret Hill DrJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 6512 Lancret Hill DrApr 6, 2026Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 6604 Lancret Hill DrJul 16, 2026Replacement of complete existing central heat and air system with or without duct work rials · 145 m away
- 6306 London DrMar 29, 2024Replacement of complete existing central heat and air system with or without duct work · 193 m away
- 6304 London DrNov 13, 2025Water heater replacement like for like · 198 m away
- 6617 Lancret Hill DrAug 5, 202630 trench for waterline repipe & 40 gallon natural gas water heater replacement · 210 m away
- 2904 Bushnell DrOct 13, 2025Replacement of complete existing central heat and air system with or without duct work hvac change out · 212 m away
- 2909 Headly DrJul 14, 2026Replacement of complete existing central heat and air system with or without duct work · 232 m away
- 2903 Dillionhill DrDec 26, 2025Replace tankless water heater and concentric venting through the roof · 244 m away
More pools in 78745.