404 Ramble Ln
Austin, TX 78745
404 Ramble Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 404 Ramble Ln, Austin, TX 78745. The most recent, filed May 15, 2025, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated May 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 15, 2025
- since May 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-059397 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 404 Ramble Ln
What is being built at 404 Ramble Ln?
The latest filing (City of Austin permit 2025-059397 EP, May 15, 2025) covers install level 2 ev charger.
How many permits and filings does 404 Ramble Ln have?
1 filing across 1 project, from May 15, 2025 to May 15, 2025.
Is there other construction near 404 Ramble Ln?
Yes. Nearby filings include 406 Ramble Ln (tunnling under home changing out piping under home replacing all piping and accessing from the left right and back side of the home, Mar 30, 2026); 402 Ramble Ln (tankless water heater install, Apr 5, 2024); 403 Ramble Ln (express- replacing current siding with hardiplank lap siding to update home to new style, Sep 2, 2026).
How do I get alerts for new permits at 404 Ramble Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 406 Ramble LnMar 30, 2026Tunnling under home changing out piping under home replacing all piping and accessing from the left right and back side of the home · 16 m away
- 402 Ramble LnApr 5, 2024Tankless water heater install · 21 m away
- 403 Ramble LnSep 2, 2026Express- replacing current siding with hardiplank lap siding to update home to new style · 66 m away
- 409 Ramble LnOct 19, 2025The cast iron sewer line has under the home has collapsed and we had to tunnel under home to replace sewer main and branches for the fixtures. weve connected to preexisting cast iron piping through slab foundation and have tested for leaks · 70 m away
- 5201 Harvest CirOct 24, 2024Replacement of an existing water heater · 71 m away
- 5119 Creekline DrSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 5205 Creekline DrJul 24, 2025Express: foundation repair (5 push piers) · 89 m away
- 329 Ramble LnNov 4, 2026Interior remodel/garage conversion - include gutting drywall replacing exterior siding converting bedroom to closets closing in a small nook in garage to walk-in pantry. 25 sq addition into garage · 93 m away
- 5307 Harvest LnFeb 25, 2026Re-route water lines through the attic to replace the old lines in slab · 94 m away
- 5115 Creekline DrAug 6, 2026Tunnel under foundation to replace cast irons drain lines for 2 full bathrooms kitchen and washer drain line. total length of tunnel is approximately 80 feet with 3 access holes one located in the back left corner of the home the second located by kitchen drain and the third where drain line exits the foundation. sewer line replacement from the home to the city tap connection total length is approximately 40 feet · 100 m away
- 5204 Greenheart DrJun 11, 2026Upgrade 200 amp 240 volt service · 106 m away
- 503 Ramble LnOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 118 m away