groundranger
Recent · latest filing Oct 2025Residential

409 Ramble Ln

Austin, TX 78745

409 Ramble Ln: 1 project on record

City of Austin lists 1 filing across 1 project at 409 Ramble Ln, Austin, TX 78745. The most recent, filed October 19, 2025, covers: “The cast iron sewer line has under the home has collapsed and we had to tunnel under home to replace sewer main and branches for the fixtures. weve connected to preexisting cast iron piping through slab foundation and have tested for leaks”.

Compiled from City of Austin records · updated Oct 19, 2025

Projects
1
1 filings
Latest filing
Oct 19, 2025
since Oct 19, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. The cast iron sewer line has under the home has collapsed and we had to tunnel under home to replace sewer main and branches for the fixtures. weve connected to preexisting cast iron piping through slab foundation and have tested for leaks

    The cast iron sewer line has under the home has collapsed and we had to tunnel under home to replace sewer main and branches for the fixtures. weve connected to preexisting cast iron piping through slab foundation and have tested for leaks

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 409 Ramble Ln

What is being built at 409 Ramble Ln?

The latest filing (City of Austin permit 2025-132361 PP, October 19, 2025) covers the cast iron sewer line has under the home has collapsed and we had to tunnel under home to replace sewer main and branches for the fixtures. weve connected to preexisting cast iron piping through slab foundation and have tested for leaks.

How many permits and filings does 409 Ramble Ln have?

1 filing across 1 project, from October 19, 2025 to October 19, 2025.

Is there other construction near 409 Ramble Ln?

Yes. Nearby filings include 503 Ramble Ln (replacement of complete existing central heat and air system with or without duct work, Oct 27, 2025); 406 Ramble Ln (tunnling under home changing out piping under home replacing all piping and accessing from the left right and back side of the home, Mar 30, 2026); 404 Ramble Ln (install level 2 ev charger, May 15, 2025).

How do I get alerts for new permits at 409 Ramble Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78745
Get alerts for 409 Ramble Ln