404 Treys Way
Austin, TX 78745
404 Treys Way: 1 project on record
City of Austin lists 1 filing across 1 project at 404 Treys Way, Austin, TX 78745. The most recent, filed August 1, 2024, covers: “200-amp underground service rebuild”.
Compiled from City of Austin records · updated Aug 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 1, 2024
- since Aug 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled200-amp underground service rebuild
- AppliedJul 30, 2024
- IssuedAug 1, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 12, 2024
Passed final inspection Aug 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project200-amp underground service rebuild
200-amp underground service rebuild
City of Austin permitElectrical PermitFinal- Record
- 2024-095551 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 404 Treys Way
What is being built at 404 Treys Way?
The latest filing (City of Austin permit 2024-095551 EP, August 1, 2024) covers 200-amp underground service rebuild.
How many permits and filings does 404 Treys Way have?
1 filing across 1 project, from August 1, 2024 to August 1, 2024.
Is there other construction near 404 Treys Way?
Yes. Nearby filings include 405 Treys Way (replacement of condenser only, Aug 2, 2024); 401 Treys Way (tunnel under slab to expose and replace the kitchen and bathroom groups. we will also be replacing section of main building drain as well. tunnel access will be located at front of home, Nov 24, 2025); 501 Treys Way (replace 150-amp main breaker panel only (no meter work), Nov 15, 2025).
How do I get alerts for new permits at 404 Treys Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 405 Treys WayAug 2, 2024Replacement of condenser only · 44 m away
- 401 Treys WayNov 24, 2025Tunnel under slab to expose and replace the kitchen and bathroom groups. we will also be replacing section of main building drain as well. tunnel access will be located at front of home · 61 m away
- 501 Treys WayNov 15, 2025Replace 150-amp main breaker panel only (no meter work) · 63 m away
- 403 Flournoy DrDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 5910 Cedardale DrJul 18, 2025Request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service with 200 amp ats 200a ug service upgrade · 90 m away
- 408 Blueberry HillOct 1, 2024Express: fire loss general demolition framing repairs roof replacement plumbing electrical hvac siding drywall insulation cabinets finish carpentry repairs. pant · 110 m away
- 5909 Glenhollow PathAug 5, 2026Sewer spot repair from the house to the city sewer tap · 111 m away
- 6000 Merriwood DrDec 12, 2025Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 410 Blueberry HillMay 2, 2025Express: foundation repair · 124 m away
- 6010 Merriwood DrOct 20, 2025Replace existing sewer line from the house to the existing coa tap · 127 m away
- 5907 Glenhollow PathJun 11, 2026Residential sewer system replacement. scope includes approximately 35 linear feet of exterior trenching and 63 linear feet of tunneling beneath the residence to access and replace existing deteriorated sanitary sewer piping. work includes removal of existing under-slab drainage piping installation of new code-compliant pvc sanitary sewer piping reconnection of branch drains serving guest bathroom master bathroom and kitchen fixtures installation of required fittings and cleanouts verification of proper pipe grade and alignment testing of the completed drainage system backfill of excavated areas and coordination of required inspections. no new sewer tap requested. existing connection to city of austin sanitary sewer system to remain in service · 128 m away
- 403 Blueberry HillOct 27, 2026Replace 125a main panel · 128 m away