405 Treys Way
Austin, TX 78745
405 Treys Way: 1 project on record
City of Austin lists 1 filing across 1 project at 405 Treys Way, Austin, TX 78745. The most recent, filed August 2, 2024, covers: “Replacement of condenser only”.
Compiled from City of Austin records · updated Aug 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 2, 2024
- since Aug 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of condenser only
- AppliedJul 30, 2024
- IssuedAug 2, 2024
- !WorkAug '24 – Jul '25
- Final inspection
Marked expired Jul 29, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of condenser only
Replacement of condenser only
City of Austin permitMechanical PermitExpired- Record
- 2024-095653 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 405 Treys Way
What is being built at 405 Treys Way?
The latest filing (City of Austin permit 2024-095653 MP, August 2, 2024) covers replacement of condenser only.
How many permits and filings does 405 Treys Way have?
1 filing across 1 project, from August 2, 2024 to August 2, 2024.
Is there other construction near 405 Treys Way?
Yes. Nearby filings include 401 Treys Way (tunnel under slab to expose and replace the kitchen and bathroom groups. we will also be replacing section of main building drain as well. tunnel access will be located at front of home, Nov 24, 2025); 404 Treys Way (200-amp underground service rebuild, Aug 1, 2024); 501 Treys Way (replace 150-amp main breaker panel only (no meter work), Nov 15, 2025).
How do I get alerts for new permits at 405 Treys Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 401 Treys WayNov 24, 2025Tunnel under slab to expose and replace the kitchen and bathroom groups. we will also be replacing section of main building drain as well. tunnel access will be located at front of home · 41 m away
- 404 Treys WayAug 1, 2024200-amp underground service rebuild · 44 m away
- 501 Treys WayNov 15, 2025Replace 150-amp main breaker panel only (no meter work) · 59 m away
- 403 Blueberry HillOct 27, 2026Replace 125a main panel · 92 m away
- 408 Blueberry HillOct 1, 2024Express: fire loss general demolition framing repairs roof replacement plumbing electrical hvac siding drywall insulation cabinets finish carpentry repairs. pant · 96 m away
- 403 Flournoy DrDec 15, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 6010 Merriwood DrOct 20, 2025Replace existing sewer line from the house to the existing coa tap · 105 m away
- 410 Blueberry HillMay 2, 2025Express: foundation repair · 113 m away
- 6102 Merriwood DrAug 30, 2024Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 500 Blueberry HillJan 15, 2024Express existing foundation repair · 130 m away
- 6000 Merriwood DrDec 12, 2025Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 5910 Cedardale DrJul 18, 2025Request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 200 amp service with 200 amp ats 200a ug service upgrade · 134 m away