Sewer line replacement at 4706 Mount Vernon Dr
A sewer line from the house to the city tap is being replaced at 4706 Mount Vernon Dr. The City of Austin issued plumbing permit 2025-160281 PP on December 22, 2025; its status is Final.
Summarized from City of Austin records · updated Dec 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 22, 2025
- since Dec 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line replacement from house to city tap approx 62 starting on the right side of the house
- AppliedDec 18, 2025
- IssuedDec 22, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 30, 2025
Passed final inspection Dec 30, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line replacement from house to city tap approx 62 starting on the right side of the house
Sewer line replacement from house to city tap approx 62 starting on the right side of the house
City of Austin permitPlumbing PermitFinal- Record
- 2025-160281 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4706 Mount Vernon Dr
What is being built at 4706 Mount Vernon Dr?
The permit is for replacing the sewer line from the house to the city tap. It does not describe a new building.
Was a building permit filed for 4706 Mount Vernon Dr?
A City of Austin plumbing permit, 2025-160281 PP, was filed on December 22, 2025, for sewer line replacement.
When was the sewer line permit filed?
The City of Austin permit was filed on December 22, 2025.
What is permit 2025-160281 PP for?
Permit 2025-160281 PP covers replacing the sewer line from the house to the city tap.
Is the permit for 4706 Mount Vernon Dr final?
Yes. The City of Austin lists permit 2025-160281 PP as Final.
Also being built nearby
All of 78745- 4702 Mount Vernon DrSep 4, 2024New concrete pool and spa · 45 m away
- 4705 Mount Vernon DrMar 27, 2026Hardwire evse to 60a 2-pole breaker in 200a mbp. route wiring back-to-back from panel through wall to rear-side interior garage wall. the charger will be installed on a 60a circuit and will draw up to 48a continuous. additional installation notes: cut drywall access as needed for routing. replace drywall patches upon completion; finishing (tape/mud/paint) is by others. commissioning · 51 m away
- 4703 Mount Vernon DrSep 6, 2024Construct new driveway approach of 16 ft. no sidewalk inspection per plan review · 57 m away
- 4714 Mount Vernon DrFeb 27, 2025Install new gas line for generator · 88 m away
- 4611 Jinx AveDec 9, 2014Forest oaks, lot 1, block k; resubdivision · 97 m away
- 4716 Mount Vernon DrMay 17, 2024New construction inground gunite pool with autocover · 103 m away
- 4719 Mount Vernon DrSep 28, 2026Replacement of complete existing central heat and air system with or without duct work like for like 3 ton 2 stage vertical gas · 116 m away
- 1201 Arden DrDec 12, 2024Replacement of an existing water heater · 121 m away
- 1200 Arden DrAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 1200 Green Forest DrDec 26, 2024New pool/spa with required enclosure and concrete deck (heater or autofill) · 124 m away
- 4616 Hank AveJan 17, 2024Express: reroof house · 138 m away
- 4608 Jinx AveSep 9, 2026Building 2 new construction of a 2-story single family res. [3bed 2.5bath] with attached garage · 141 m away