Central heating and air system replacement permitted in Austin
A permit covers replacement of the complete existing central heating and air system at 5002 Aberdeen Dr. The City of Austin issued the mechanical permit on July 30, 2026; its status is Final.
Summarized from City of Austin records · updated Jul 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 30, 2026
- since Jul 30, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work clayton
- AppliedJul 24, 2026
- IssuedJul 30, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 5, 2026
Passed final inspection Aug 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work clayton
Replacement of complete existing central heat and air system with or without duct work clayton
City of Austin permitMechanical PermitFinal- Record
- 2026-095796 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5002 Aberdeen Dr
What work was permitted at 5002 Aberdeen Dr?
A City of Austin permit covers replacement of the complete existing central heating and air system, with or without duct work.
When was the permit for 5002 Aberdeen Dr issued?
The City of Austin permit was filed on July 30, 2026.
What is the permit number for 5002 Aberdeen Dr?
The permit number is 2026-095796 MP.
Is the 5002 Aberdeen Dr permit final?
Yes. The City of Austin lists permit 2026-095796 MP as Final.
Is a new building being constructed at 5002 Aberdeen Dr?
The available permit describes replacement of the existing central heating and air system, not new building construction.
Does the permit give a project cost or square footage?
No project cost or square footage is reported in the available permit record.
Also being built nearby
All of 78745- 5007 Aberdeen DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 808 Glen Oak DrAug 6, 202442ft tunnel to repair main water line as well as master bath & hall bath branch line drains · 86 m away
- 801 Cardiff DrOct 19, 2026Total demolition of single-story sfr 1474 sq ft circa 1969 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 110 m away
- 803 Cardiff DrMay 16, 2024Express: interior non structural demolition of drywall · 120 m away
- 804 Emerald Wood DrMar 5, 2025Replace swer yard line 30ft · 121 m away
- 4906 Aberdeen CirOct 6, 2025Construct new driveway approach of 12 ft and sidewalk of 63 lf and curb & gutter of 68 ft · 123 m away
- 813 Hill Wood DrJul 14, 2026We will be replacing 35 feet of sewer line from house to city tap in yard. current sewer line is made of orangeburg pipe and we will be replacing with approved materials · 132 m away
- 817 Glen Oak DrJul 7, 2026Replacement of an existing water heater swapping tank style gas water heater for similar model · 151 m away
- 807 Emerald Wood DrDec 8, 2023Replace existing water heater · 166 m away
- 814 Emerald Wood DrOct 20, 2026Replace sewer line 37 ft [no bathroom services] · 175 m away
- 4901 Aberdeen CirMar 27, 2026Replacement of an existing water heater tanked to tankless water heater · 182 m away
- 704 Emerald Wood DrDec 4, 2025Approximately 10ft of gas line installed for new pool heater · 186 m away